Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 879.45 411.97 46.84  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gobindapur & Adjoing Mouza to accommodate FHTC , SM/11599 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gobindapur water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/001007/2022-2023 170/BD 19/01/2023 90 KINGS & CO. 437.87 108.19 24.71 66
2 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Gobindapur & Adjoing Mouza to accommodate FHTC , SM/11599 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I & II (Replacement) under Puturia W/S Scheme, Bahira W/S Scheme, Gabberia W/S Scheme and Gobindapur (Block-Bagdah) W/S Scheme, District of 24 Pgs. (N). Assistant Engineer Junior Engineer ORD/001174/2023-2024 4802/EMD 09/08/2023 30 M/S. SAJAHAN CHOWDHURY 88.56 5.09 5.75 50
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gobindapur & Adjoing Mouza to accommodate FHTC , SM/11599 Augmentation Acceptance cum work order for Repair and renovation works of 350cum capacity 20mtr. staging height R.C.C. Over Head Reservoir for Augmentation of Gobindapur Water Supply Scheme, Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. Assistant Engineer ORD/000896/2024-2025 3403/BD 04/12/2024 30 UPWARDS ENGINEERING PRIVATE LIMITED. 8.62 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gobindapur & Adjoing Mouza to accommodate FHTC , SM/11599 Augmentation Repairing & Renovation of 02Nos. Pump House and allied works at Gobindapur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002971/2021-2022 585/ BON 15/12/2021 21 M/S SAYAN ENTERPRISE. 2.52 2.31 91.67 1
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Gobindapur & Adjoing Mouza to accommodate FHTC , SM/11599 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Gobindapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000781/2022-2023 3488/BD 02/12/2022 90 M/S NIRMAN CONSTRUCTION. 341.88 296.38 86.69 99
Total 879.46 411.96 46.84