Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 991.14 794.61 80.17  
1 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Route Survey, Design Drawing & Preparation of DPR for Shimulpur Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001348/2021-2022 144/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.34 0.00 0 1
2 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Route Survey, Design Drawing & Preparation of DPR for Shimulpur Water Supply Scheme in Gaighata Block withinthe Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002899/2021-2022 144/ BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.34 4.32 99.54 1
3 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Work order for repairing & renovation of Pump House and allied works of Simulpur Water Supply Scheme. Assistant Engineer Junior Engineer ORD/002943/2021-2022 587/ BON 15/12/2021 21 ONKAR ENTERPRISE. 2.52 2.32 92.06 1
4 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Repairing & Renovation of 01No. Pump House and allied works at Shimulur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002972/2021-2022 631/ BON 31/12/2021 15 ONKAR ENTERPRISE. 1.26 1.15 91.27 1
5 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Material Requisition To Resource Division RTOR000114/2022-2023 3690/BD 14/12/2022 0 Resource Division 52.10 0.00 0 0
6 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Material Requisition To Resource Division RTOR000095/2022-2023 3654/BD 13/12/2022 0 Resource Division 40.85 0.00 0 0
7 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Shimulpur water supply scheme at Head Work Site under Bongaon Sub-Division P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000797/2023-2024 2697/BD 04/09/2023 30 NADIA TUBEWELLS 16.16 13.93 86.2 100
8 NORTH 24 PARGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II and III (Rep) under Shimulpur W/S Scheme and Pump House No-I and II (Rep.) under Ichapur W/S Scheme and Kalupur W/S Scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/001170/2023-2024 4798/EMD 09/08/2023 30 ORIENTAL ENGINEERING CO. 91.05 27.49 30.19 80
9 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Shimulpur Water Supply Scheme (2nd T/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte Assistant Engineer Junior Engineer ORD/001113/2023-2024 2936/BD 27/09/2023 442 JOY GURU ENTERPRISE 16.12 5.24 32.51 100
10 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Acceptance cum work order for Repairing of Boundary wall and Construction of Approach Road at Head Work site, 2nd Pump House Site & 3rd Pump House Site under Augmentation of Shimulpur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001747/2023-2024 564/BD 22/02/2024 45 M/S SUKANTA ENTERPRISE. 12.72 12.70 99.84 100
11 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Formal work order for Additional laying of UPVC pipe with allied works to connect every house hold connection under Augmentation work at Simulpur W/S Scheme Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001767/2023-2024 610/BD 27/02/2024 90 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 102.67 102.66 99.99 100
12 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Acceptance cum work order for Improvement of Iron Elimination Plant and other related allied works and Repairing and renovation of Compressor Room for Iron Elimination Plant under Augmentation of Shimulpur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001784/2023-2024 628/BD 28/02/2024 45 TAPAN GHOSH. 6.03 1.59 26.37 100
13 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Construction of Latrine at Head Work site for Augmentation of Shimulpur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000616/2025-2026 672/Bon 26/05/2025 45 A.D.ENTERPRISE. 1.75 0.00 0 0
14 NORTH 24 PARGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC , SM/11598 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection(FHTC) for Augmentation of Shimulpur water supply scheme under Bongaon Sub-Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000006/2023-2024 1126/BD 11/04/2023 720 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 639.23 623.21 97.49 100
Total 991.14 794.60 80.17