Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 543.91 317.77 58.42  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-III) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002787/2021-2022 125/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.42 3.40 99.42 1
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Repairing & Renovation 2(Two) nos of Pump House and allied works of Chhaygharia (Zone-III) water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002927/2021-2022 535/Bon 03/11/2021 21 VAI ENTERPIRSE. 2.52 2.47 98.02 1
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Material Requisition To Resource Division RTOR000093/2022-2023 3653/BD 13/12/2022 Resource Division 15.03 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Material Requisition To Resource Division RTOR000110/2022-2023 3695/BD 14/12/2022 Resource Division 110.28 0.00 0 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chhayagharia (Zone-III) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000784/2022-2023 3491/BD 02/12/2022 90 M/S PROGATI ENTERPRISE. 296.33 296.19 99.95 100
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer at Chhaighoria (Zone-III) water supply scheme (2nd T/W Site) under Bongaon Sub-Division P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000096/2023-2024 1546/BD 22/05/2023 30 NEW MA TARA ENTERPRISE. 15.81 5.04 31.88 100
7 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sinkinng Tube Well in connection to Accommodate FHTC at Pump House No.-I , II Zone-III under Chhaygharia ground water based water supply scheme under Block_ Bongaon Dist. - North 24PGS under EMD, PHE Dte. Assistant Engineer Junior Engineer ORD/002818/2023-2024 806/EMD 11/03/2024 30 INDIA ENTERPRISE 25.79 5.74 22.26 50
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Chhaygharia (Zone-III) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000349/2024-2025 2419/BD 23/08/2024 60 ONKAR ENTERPRISE. 42.48 0.00 0 0
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Acceptance cum work order for Renovation and repairing of Boundary wall at 1st Tube Well & 2nd Tube Well site and Construction of Approach Road at 1st Tube Well & 2nd Tube Well site under Augmentation of Chhaygharia (Zone-III) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001745/2023-2024 561/BD 22/02/2024 45 ROY ENGINEERS. 10.23 4.93 48.19 100
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Laying of UPVC pipe line at different damaged portions under Augmentation work at Chhaygharia (Zone-III) W/S Scheme Bongaon block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000883/2024-2025 1384/Bon 26/11/2024 30 JOY GURU ENTERPRISE 4.96 0.00 0 0
11 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe under Augmentation work at Chhaygharia (Zone-III) W/S Scheme Bongaon block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. (Part-A). Assistant Engineer ORD/000849/2024-2025 3385/BD 03/12/2024 30 VAI ENTERPRISE. 12.02 0.00 0 0
12 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Chhayageria Zone-III to Accommodate FHTC , SM/11594 Augmentation Quotation for New service connection at P.H.No- OHR ,Zone - III of Chhaygharia water supply scheme under EMSD-I ,PHE Dte. in Dist.- 24Pgs(N). BILL/02467/2024-2025 BP-211 09/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 5.04 0.00 0 null
Total 543.91 317.78 58.42