Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 670.19 454.03 67.75  
1 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Material Requisition To Resource Division RTOR000116/2022-2023 3687/BD 14/12/2022 0 Resource Division 7.03 0.00 0 0
2 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Material Requisition To Resource Division RTOR000123/2022-2023 3710/BD 15/12/2022 0 Resource Division 18.47 0.00 0 0
3 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Repairing & Renovation 2(Two) nos of Pump House and allied works of Ghatpatila (Zone-I) water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002929/2021-2022 539/Bon 03/11/2021 21 ROY CHOWDHURY CONSTRUCTION. 2.52 2.49 98.81 1
4 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) For Augmentation of Ghatpatila Zone-I Water Supply Scheme in Bagdah Block under Bongaon Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000775/2022-2023 3469/BD 01/12/2022 90 H.I.ENTERPRISE. 471.66 413.30 87.63 0
5 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer at Ghatpatila (Zone-I) water supply scheme (Head Work Site) under Bongaon Sub-Division P.H.E.Dte. Part-A Assistant Engineer Junior Engineer ORD/000097/2023-2024 1548/BD 22/05/2023 30 SAHA CONSTRUCTION & CO 16.16 13.69 84.72 100
6 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Acceptance cum work order forSinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer at Ghatpatila (Zone-I) water supply scheme (2nd T/W Site) under Bongaon Sub-Division P.H.E.Dte.-- Part- B Assistant Engineer Junior Engineer ORD/000098/2023-2024 1547/BD 22/05/2023 30 SAHA CONSTRUCTION & CO 16.17 13.75 85.03 100
7 NORTH 24 PARGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Supply fitting fixing of change over switch at P.H.No-I & II ,Zone-I of Ghatpatila and P.H.No- I & II of Kola W/S Scheme under EMSD-I, P.H.E. Dte. Dist.-24Pgs(N). Assistant Engineer Junior Engineer ORD/001819/2023-2024 1814/EMSD-I 18/08/2023 15 SUNRISE ENGINEERING CORPORATION 0.86 0.00 0 100
8 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Material Requisition To Resource Division RTOR000154/2022-2023 1255/BD 25/04/2023 0 Resource Division 73.62 0.00 0 0
9 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Ghatpatila (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001487/2023-2024 4464/BD 21/11/2023 23 KAMAL HALDER. 6.86 3.43 50 60
10 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Ghatpatila (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001454/2023-2024 4408/BD 10/11/2023 60 ONKAR ENTERPRISE. 11.79 0.00 0 100
11 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Enhancement of GST for providing Functional Household Tap Connection (FHTC) in connection with JJM and Jal Swapna Programme within command area of Ghatpatila Zone-I WS Scheme BILL/00832/2024-2025 BP-02024-25-262 12/09/2024 0 H.I.ENTERPRISE. 22.17 0.00 0 0
12 NORTH 24 PARGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Ghatpatila (Zone-I) to accommodate FHTC , SM/11540 Augmentation Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe and Tube well connection under Augmentation work at Ghatpatila W/S Scheme (Zone - I), Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000078/2024-2025 1770/BD 01/07/2024 315 ROY CHOWDHURY CONSTRUCTION. 22.88 7.37 32.21 100
Total 670.19 454.03 67.75