Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 478.22 329.82 68.97  
1 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Making Suitable Foundation at out side of the PUmp House of 1000ltr PV Tank at PH-I Z-II under Kurulia W/S Scheme, W/O-1036/SD-I, T.No.1132/SD-I ORD/000324/2021-2022 1036/SD I 04/05/2021 30 TAMAL ENTERPRISE 0.63 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Repairing & Renovation of 02Nos. Pump House and allied works at Gangrapota water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002958/2021-2022 536/BON 03/11/2021 21 GHOSH CONSTRUCTION. 2.52 2.48 98.41 1
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Repairing & Renovation of 01No. Pump House (PH-III) and allied works at Gangrapota water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002968/2021-2022 635/ BON 31/12/2021 15 GHOSH CONSTRUCTION. 1.26 1.15 91.27 1
4 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.II under Ganrapota W/S Scheme District of 24 Pgs. (N) (Block- Baduria).NIET No.- 15 of EE/EMD of 2022-23 (Sl. No.-04) ORD/001893/2022-2023 6141 / EMD 14/08/2022 30 TRIDENT ENTERPRISE 9.29 9.29 100 1
5 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.I under gangrapota W/S Scheme District of 24 Pgs. (N) ORD/001908/2022-2023 6140 / EMD 14/08/2022 30 GHOSH AND GHOSH 12.82 10.58 82.53 1
6 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.II under Ganrapota W/S Scheme District of 24 Pgs. (N) (Block- Baduria).NIET No.- 15 of EE/EMD of 2022-23 (Sl. No.-04) ORD/002485/2022-2023 6141-EMD 11/11/2022 150 TRIDENT ENTERPRISE 2.70 2.70 100 0
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation at Gangrapota water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000827/2022-2023 3621/BD 12/12/2022 15 DHELA BABA ENTERPRISE 15.12 13.34 88.23 0
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Construction of Approach Road at 2nd Pump House site for Augmentation of Gangrapota Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer ORD/000967/2023-2024 555/Bon 18/07/2023 15 M/S SAYAN ENTERPRISE. 0.80 0.00 0 0
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Gangrapota Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation) Assistant Engineer Junior Engineer ORD/000004/2022-2023 1004/BD 04/04/2022 90 M/S DIPAK ENTERPRISE 298.46 282.74 94.73 1
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Material Requisition To Resource Division RTOR000005/2022-2023 1369/BD 13/05/2022 Resource Division 26.76 0.00 0 0
11 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Material Requisition To Resource Division RTOR000023/2022-2023 1675/BD 13/06/2022 Resource Division 76.64 0.00 0 0
12 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gangrapota Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001170/2023-2024 2928/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.13 0.00 0 100
13 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC , SM/10309 Augmentation Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Gangrapota Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001759/2023-2024 519/BD 20/02/2024 30 S.D. CONSTRUCTION. 15.09 7.54 49.97 100
Total 478.20 329.82 68.97