Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
21 1,459.54 262.21 17.97  
1 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Material Requisition To Resource Division RTOR000020/2022-2023 1090/NACD-II 09/12/2022 0 Resource Division 63.84 0.00 0 0
2 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Sinking of 2 nos. 250 mm X 150 mm dia, 180 mtr deep Tube Well by Direct Rotary Method at Head Work site and 2nd Tube Well site with UPVC pipe (CD) & strainer, (250 mm dia 36 mtr. long housing pipe & 150 mm dia 30 mtr. long strainer) at Tarinipur Water Supply Scheme under Nadia Arsenic Civil Division-II PHE Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000282/2022-2023 1137/NACD-II 16/12/2022 30 AUXILIARY TUBE WELL DRILLERS 21.03 19.17 91.16 100
3 NADIA Tehatta-I Eastern Mechanical TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Providing Electro-Mechanical Equipments and Allied Works for Arsenic Removal Plant at TARINIPUR Piped Water Supply Scheme, Block: Tehatta-I, Dist. Nadia Under EMD, PHE Dte. ORD/001119/2023-2024 4707/EMD 04/08/2023 30 HARA PROSAD DAS 51.92 0.00 0 0
4 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Material Requisition To Resource Division RTOR000026/2022-2023 379/NACD-II 24/03/2023 0 Resource Division 11.38 0.00 0 0
5 NADIA Tehatta-I Eastern Mechanical TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New New Service Connection under Ae, EMSD-III, Taranipur PH_I BILL/01871/2023-2024 BP-108-23-24 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.34 0.00 0 0
6 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New APPLICATION FOR OBTAINING PERMIT FOR SINKING OF NEW WELL BILL/00094/2022-2023 235/9 21/02/2023 0 GEOLOGIST GEOLOGICAL SUB-DIVN NO-III/A STATE WATER INVESTIGATION & DEVELOPMENT DTE. 0.01 0.00 0 0
7 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Acceptance of 17 nos. of application (STW) for obtaining permit for domestic drinking water supply purposes. BILL/00021/2023-2024 23 19/04/2023 0 GEOLOGIST GEOLOGICAL SUB-DIVN NO-III/A STATE WATER INVESTIGATION & DEVELOPMENT DTE. 0.02 0.00 0 0
8 NADIA Tehatta-I Eastern Mechanical TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New New Service Connection under Ae, EMSD-III, Taranipur PH_I BILL/01872/2023-2024 BP-107-23-24 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 5.78 0.00 0 0
9 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Additional instrumentation with augmentation of backwashing system with appropriate wattage including recirculation in compliance with 12699: 1989 as well as reaffirmation there into for contamination removal of various valent systems at Taranipur Piped Water Supply Scheme in Tehatta-I Block under Nadia Arsenic Civil Division-II,P.H.E. Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 3 ,Nadia Arsenic Civil Division-II ORD/000323/2024-2025 1521/NACD-II 26/11/2024 30 NEER UDYOG 31.56 0.00 0 0
10 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Acceptance cum work order "Construction of 50 m3/hr capacity IEP at Taranipur PWSS in Tehatta-I Block under Nadia Arsenic Civil Division-II,P.H.E. Dte." Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 3 ,Nadia Arsenic Civil Division-II ORD/000294/2023-2024 324/NACD-II 04/03/2024 61 NEER UDYOG 23.20 0.00 0 0
11 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Construction of Boundary wall with Grill Gate and Barbed wire fencing at Thanapara Zone-III & Taranipur Water Supply Scheme Head Work site under Nadia Arsenic Civil Division-II PHE Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000338/2024-2025 1398/NACD-II 22/10/2024 90 PAPAN ROY 16.66 12.85 77.13 60
12 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Portal framed structural arrangement as well as Water supply / sanitation arrangement and left out hydraulics in the proposed sites of Taranipur water supply scheme under Nadia Arsenic Civil Division-II, PHE Dte. Dist- Nadia. Assistant Engineer -I (HQ), Nadia Arsenic Civil Divisio,Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 3 ,Nadia Arsenic Civil Division-II ORD/000143/2023-2024 1386/NACD-II 12/12/2023 45 CHINMOY BISWAS 11.33 11.26 99.38 100
13 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Securitization arrangement by composite RCC Masonry structures without harming the T & P In the proposed sites of Taranipur water supply scheme under Tehatta- I Block under Nadia Arsenic Civil Division-II, P.H.E. Dte. Nadia. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 3 ,Nadia Arsenic Civil Division-II,Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000228/2023-2024 165/NACD-II 07/02/2024 60 M/S K.P. CONSTRUCTION 32.46 28.03 86.35 100
14 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 01 (One) No of 350 Cum capacity 20 mtr staging height R.C.C. Over Head Water Reservoir as per Departmental design, Drawing, and specification including bored pile & pile cap, Laying of Distribution system including providing Functional House Hold Tap Connection (FHTC) and Laying of Rising Main and other necessary allied works at Taranipur Water Supply Scheme and other necessary allied works in this connection of Tehatta-I Block under Nadia Arsenic Civil Division-II P.H.E. Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 3 ,Nadia Arsenic Civil Division-II,Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000393/2022-2023 402/NACD-II 28/03/2023 904 B.M. ENGINEERING & CONSTRUCTION 345.19 172.16 49.87 43
15 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Incorporation of the system of adsorption by Inorganic sustances for multivalent metalloid expulsion for improving potability in coordination with IS 10500 With latest edition at Taranipur Piped Water Supply Scheme in Tehatta-I Block under Nadia Arsenic Civil Division-II,P.H.E. Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000378/2024-2025 47/NACD-II 10/01/2025 30 NEER UDYOG 29.92 0.00 0 0
16 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Laying of distribution system including providing FHTC at left out households for Thanarpara Zone-III (Vill- Char Gaurbhanga, Falia, Yusufpur) , Jitpur , Taranipur & Dhopahat W/S Scheme in Nadia District under Nadia Arsenic Civil Division-II, P.H.E. Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000346/2024-2025 1627/NACD-II 19/12/2024 270 M.R. CONSTRUCTION 117.87 0.00 0 40
17 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Conversion of IEP to AIRP at Patharghata Water Supply Scheme of capacity 96 Cu.m/hr in Tehatta - I Block under Nadia Arsenic Civil Division -II, PHE Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000295/2024-2025 1396/NACD-II 22/10/2024 360 JOY HIND TUBEWELLS 258.38 0.00 0 0
18 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Acceptance cum work order "Conversion of IEP to AIRP at Mobarakpur, Binodnagar & Taranipur Water Supply Scheme of capacity 93 Cu.m/hr in Tehatta-I Block under Nadia Arsenic Civil Division -II, PHE Dte." Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000282/2023-2024 152/NACD-II 02/02/2024 598 B.M. ENGINEERING & CONSTRUCTION 241.81 0.00 0 0
19 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Construction and installation of MANIFOLD with dedicated Pipe Line including laying of distribution network for left out FHTC under Bagakhali Zone-I and Bagakhali Zone-II Piped Water Supply Scheme in Tehatta-I Block under Nadia Arsenic Civil Division-II,P.H.E Dte. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000325/2024-2025 1562/NACD-II 05/12/2024 360 DEBASIS SAMADDAR 157.57 0.00 0 40
20 NADIA Tehatta-I Nadia Arsenic Civil Division II TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Construction of Boundary wall with Grill Gate and Barbed wire fencing at Thanapara Zone-II Water Supply Scheme Head Work site under Nadia Arsenic Civil Division-II PHE Dte. & including Binodnagar PWSS,Manoharpur PWSS, Rajapur PWSS & Taranipur PWSS. Assistant Engineer -II, Nadia Arsenic Civil Division-II Junior Engineer 4, Nadia Arsenic Civil Division-II ORD/000001/2025-2026 428/NACD-II 07/04/2025 180 TULIP ENGINEERS CO OP. SOCIETY LTD. 19.28 0.00 0 30
21 NADIA Tehatta-I Eastern Mechanical TARANIPUR PIPED WATER SUPPLY SCHEME , SM/11964 New Supply, delivery & installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator in connection with Aug. work related to FHTC at Pump House No.I & II under TARINIPUR W/S Scheme (Block : Tehatta I) Dist.- Nadia. NIET No.- 39 of EE/EMD of 2022-23 (Sl. No.- 08) Assistant Engineer Junior Engineer ORD/000028/2023-2024 1607/EMD 26/04/2023 616 SHIVAM ENTERPRISE 18.99 18.74 98.68 70
Total 1,459.53 262.20 17.96