Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 2,441.02 14.25 0.58  
1 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Preparation of Detailed Project Report (DPR) for Hijuli Water Supply Scheme at Ranaghat-II Block at Nadia District under Nadia Arsenic Division-I, P.H.E. Dte.(sl.04) Assistant Engineer-I Junior Engineer-IV ORD/000180/2022-2023 39 /NAD-I 17/01/2023 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT LTD. 14.36 14.25 99.23 100
2 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Material Requisition To Resource Division RTOR000023/2023-2024 59/NAD-I 16/01/2024 0 Resource Division 31.88 0.00 0 0
3 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials, 10 mm gun metal ferrule, saddle piece etc. all complete with Rising Main System including specials & valves. & LAYING OF DISTRIBUTION SYSTEM INCLUDING SPECIALS, VALVES & PIPE SUPPORTING STRUCTURE, Construction of 300/100/200/200 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pile foundation, pipe connection and cost of pipes, specials , Soil Investigation for the work of Construction of R.C.C Elevated Reservoir of Capacity 300/100/200/200 m3 Staging Height 20 Mtr, CONSTRUCTION OF BOUNDARY WALL [ H/W Site(160.0 m length), 2nd T/W Site(50.0 m length)], Pump House for H/W Site(5.4 M X 3.60 M),2nd T/W Site(3.60 M X 3.0 M) , Land Development and aliied works with Approach Road (105.0m Length and 3.0m Wide), RESTORATION WORK FOR BITUMINOUS ROAD, Hijuli (Zone-I,II,III & IV) Ground Water Based Piped Water Supply Scheme in Ranaghat-II Block of Nadia District under Nadia Arsenic Division-I, PHE Dte. Assistant Engineer-II Junior Engineer-IV ORD/000225/2023-2024 2351/NAD-I 03/10/2023 730 MAHAVIR PUMPS MANUFACTURING PRIVATE LIMITED 1,541.25 0.00 0 3
4 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Continuation work order for Hiring of 1 (One) no inspection vehicle (Diesel Luxury Taxi/Maxi Cab/Motor Cab) on Daily basis for monitoring of JJM works by the Junior Engineers at the office of the Executive Engineer, Nadia Arsenic Division-I, P.H.E. Dte. (Period- 01/08/2024 to 31/01/2025) Assistant Engineer-I Junior Engineer-IV ORD/000249/2024-2025 228/AE-I/NAD-I 24/07/2024 184 M/S DIPAK ENTERPRISE 0.86 0.00 0 0
5 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New "Work for revamping / upgradation of the hydraulic parameters in distribution network from OHR towards Joypur Pry School in reference to Hijuli and Joypur water supply scheme under Nadia Arsenic Division-I,P.H.E. Dte as a part of Jal Jeevan Mission.(SI. No. 02) ORD/000005/2025-2026 40/NAD-I 07/04/2025 60 TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD 93.13 0.00 0 0
6 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Balance Work for revamping / upgradation of the hydraulic parameters at distribution network towards Chttosali more in reference to Hijuli and Joypur water supply scheme under Nadia Arsenic Division-I,P.H.E. Dte as a part of Jal Jeevan Mission. (Sl. No. 04) ORD/000026/2025-2026 156/NAD-I 28/04/2025 60 M/S DIPAK ENTERPRISE 95.47 0.00 0 0
7 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Work revamping / upgradation of the hydraulic parameters at distribution network at the part of Malsadaha, Ulasi, Silberia, Nasra (P) and Hijuli (P) Mouzas in reference to Hijuli and Nasra PWSS under Nadia Arsenic Division-I, P.H.E. Dte as a part of Jal Jeevan Mission. (Sl. NO. 02) ORD/000060/2025-2026 359/NAD-I 09/06/2025 90 M/S DIPAK ENTERPRISE 246.94 0.00 0 0
8 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Balance work for revamping / upgradation of the hydraulic parameters at Gobindapur Colony and Hijuli mauza in reference to Gobindapur PWSS and Hijuli PWSS under Nadia Arsenic Division-I,P.H.E. Dte as a part of Jal Jeevan Mission (Sl. NO. 08) ORD/000051/2025-2026 231/NAD-I 13/05/2025 60 TARUN GHOSH 89.24 0.00 0 0
9 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Revamping / upgradation of the hydraulic parameters for Uttor Bhayna, Hatibanda, Aishmali, Nasra and Hijuli ( P ) villages in connection with Debogram, Nasra and Hijuli PWSS under Nadia Arsenic Division-I,P.H.E. Dte as a part of Jal Jeevan Mission. (Sl. No. 05) ORD/000069/2025-2026 530/NAD-I 03/07/2025 120 BUDDHADEV MONDAL 53.23 0.00 0 0
10 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Continuation work order for Hiring of 1 (One) no inspection vehicle (Diesel Luxury Taxi/Maxi Cab/Motor Cab) on Daily basis for monitoring of JJM works by the Junior Engineers at the office of the Executive Engineer, Nadia Arsenic Division-I, P.H.E. Dte. (Period- 01/02/2025 to 31/07/2025) Assistant Engineer-I Junior Engineer-IV ORD/000287/2024-2025 14/AE-I/NAD-I 30/01/2025 181 M/S DIPAK ENTERPRISE 0.86 0.00 0 0
11 NADIA Ranaghat-II Eastern Mechanical Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Providing Boundary Illumination with allied works at Hijuli under Block_ Ranaghat-II Eastern Mechanical Division, P.H.E, Dte. Dist. Nadia (SM/14243) Assistant Engineer ORD/000170/2025-2026 1168/EMD 04/06/2025 90 SHRESTHA 4.34 0.00 0 0
12 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Revamping / upgardation of hydraulic parameter of distribution network and providing FHTC for Doula, Debipur Chandpur Biraberia Dhantala & Notungram and Hizuli (Part) Village and under Jal Jeevan Mission (JJM) Under Ranaghat-II Block in connection with Dhantala PWSS & Hizuli Water Supply Scheme under Nadia Arsenic Division-I, PHE Dte. (Sl. NO. 01) ORD/000112/2025-2026 800/NAD-I 18/08/2025 90 BIDYUT KUMAR 182.15 0.00 0 0
13 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Shifting of Manifold and interconnection between old and new OHR and revamping /upgradation of hydraulic parameter in the distribution network at bhayna (P) paschim harin danga and hijuli part In connection with hijuli PWSS under Nadia Arsenic Division I, P.H.E. Dte. Assistant Engineer-II Junior Engineer-IV ORD/000107/2025-2026 721/NAD-I 29/07/2025 60 TAPU SAHA 51.24 0.00 0 0
14 NADIA Ranaghat-II Nadia Arsenic Division I Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. , SM/14243 New Balance Work for revamping/upgradation of the hydraulic parameters at distribution network at the part of Satpota and Hijuli (P) in connection with Hijuli PWSS under Nadia Arsenic Division-I, PHE Dte. As a part of Jal Jeevan Mission. (Sl. No. 01) ORD/000142/2025-2026 1044/NAD-I 25/09/2025 90 NISHITH BANERJEE 36.07 0.00 0 0
Total 2,441.03 14.25 0.58