Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 73.54 0 0  
1 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Augmentation of MANIKHAR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000157/2023-2024 2453/BWD 31/05/2023 60 SETH ENTERPRISE 34.49 0.00 0 100
2 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Work Oder for "Laying of Rising Main and alied work such as brick work, P.C.C. work and dismantling work etc. for Manikhar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000978/2023-2024 1706/KSD 01/12/2023 7 BISWAS ENTERPRISE 0.51 0.00 0 100
3 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Providing FHTC in the left out portion of Manikhar and Jurepara village along with other ancillary work in order to declare Sajal Gram under command area of Manikhar PWSS within Kalna Sub Division under Burdwan Divn., PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000037/2025-2026 1309/BWD 28/04/2025 30 PRONAB KUMAR DEY 7.80 0.00 0 100
4 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for BHAGABATITALA Habitation which is uncovered of MANIKHAR Piped W/S. Scheme, Block KALNA-1 under Burdwan Division, PHE Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000018/2025-2026 1245/BWD 23/04/2025 45 A.R. TRADERS 30.74 0.00 0 75
Total 73.55 0.00 0