Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 813.74 375.09 46.09  
1 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Material Requisition To Resource Division RTOR000111/2022-2023 1645/BWD 06/04/2023 0 Resource Division 14.26 0.00 0 0
2 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Material Requisition To Resource Division RTOR000063/2022-2023 1259/BWD 17/03/2023 0 Resource Division 17.21 0.00 0 0
3 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New New service connection charges for Kalikapur PWSS TW-1 BILL/01444/2023-2024 BP-2023-24-155 07/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.07 0.00 0 0
4 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New New service connection charges for Kalikapur PWSS TW-2 BILL/01469/2023-2024 BP-2023-24-170 27/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
5 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kalikapur Water Supply Scheme [ Block- Katwa-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000596/2023-2024 3953/CMD 24/08/2023 30 M/S, S.S. ENTERPRISE. 29.61 23.40 79.03 90
6 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000683/2024-2025 1009/KTS 19/07/2024 60 AJIT SAMANTA 0.77 0.23 29.87 100
7 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
8 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New KALIKAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000732/2022-2023 1047/BWD 09/03/2023 968 PASCON 629.59 351.46 55.82 67
9 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Balance work of OHR, Functional Household Tap Connection, Road restoration etc. for Kalikapur PWSS under KATWA -II Block under Katwa Sub-Division under Burdwan Division, PHED, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001040/2024-2025 192/BWD 08/01/2025 120 PASCON 57.78 0.00 0 90
10 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Continuation work order for Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/09/2025 to 28/02/2026) ORD/000723/2025-2026 1907/KTS 01/09/2025 181 HAMID SK 1.84 0.00 0 0
Total 813.75 375.09 46.09