Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
17 251.3 140.95 56.09  
1 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arrah village and arrah habitation of AMARUN piped water supply scheme within Durgapur (bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-542/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000252/2020-2021 3346/BWD 18/09/2020 30 M.R. CONSTRUCTION CO. 4.86 4.86 100 1
2 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I][Tr No.-508/BWD/20-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000383/2020-2021 4793/BWD 03/12/2020 30 BHARAT CONSTRUCTION 4.87 4.80 98.56 1
3 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-805/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000382/2020-2021 3345/BWD 18/09/2020 30 BHARAT CONSTRUCTION 4.87 4.87 100 1
4 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arra village and Arrah habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000624/2020-2021 4989/BWD 10/12/2020 30 M.R. CONSTRUCTION CO. 4.86 4.86 100 1
5 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-I & II) Piped Water Supply Scheme at Arra, Amarun, Nawada, Sunur (Part), Eora, Palsona & Bijyapur Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000317/2021-2022 7086/BWD 22/12/2021 60 NATIONAL CONSTRUCTION 85.05 80.10 94.18 1
6 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-II) Piped Water Supply Scheme at Hanrgram (4 Nos. Habs.), Erachya (6 Nos. Habs.) Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000363/2021-2022 7157/BWD 24/12/2021 60 S.S. CONSTRUCTION 76.46 8.94 11.69 1
7 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Relaying for shifting of distribution line at Eora village for construction of Box culvert by PWD Department within Amarun and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000313/2022-2023 525/DSD 22/08/2022 15 BHARAT CONSTRUCTION 0.73 0.00 0 0
8 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Construction of Temporary Approach road to HW site for Augmentation of Amarun (Zone-II ) Piped water supply Scheme , P.H.E Dte. Block:-Bhatar, Dist: Purba Bardhaman. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000136/2022-2023 347/DSD 30/06/2022 21 M/S S. CHOUDHURY 1.04 1.04 100 100
9 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Bijyapur Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-16] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000858/2022-2023 715/DSD 30/12/2022 30 SAMANTA CONSTRUCTION 4.83 4.83 100 100
10 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Sunur, and Amarun village for providing FHTC within Amarun W/S Scheme (Zone-I &II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [SL-17] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000859/2022-2023 716/DSD 30/12/2022 30 SAMANTA CONSTRUCTION 1.93 1.91 98.96 100
11 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Palsona Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Phase-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-15] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000857/2022-2023 714/DSD 30/12/2022 30 SANDIPAN SENGUPTA 4.81 2.40 49.9 100
12 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Hanrgram Uttarpara, Majhipukur par and Dulepara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-30] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000871/2022-2023 727/DSD 30/12/2022 30 RAM MOHAN MUKHERJEE 4.78 0.00 0 100
13 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Nandanarayanpur and Paschimpara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-27] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000869/2022-2023 725/DSD 30/12/2022 30 BABA ADHIRA CONSTRUCTION 4.83 2.42 50.1 100
14 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Kubajpur Adibasipara and Erachya for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-26] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000868/2022-2023 724/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.58 0.00 0 100
15 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Ramnagar Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-28] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000870/2022-2023 726/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.16 0.00 0 100
16 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Hanrgram Khaspara, Chhatipara and Daspara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-29] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000846/2022-2023 708/DSD 31/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.61 0.00 0 100
17 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Sinking of 250 X 150 mm dia Tubewell and Modification to distribution network by making a loop and extension with uPVC pipe to augment the water supply to FHTC at Sunur and Arra village of AMARUN and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001069/2023-2024 1016/BWD 07/03/2024 60 BAMDEB CONSTRUCTION & CO 34.03 19.92 58.54 80
Total 251.29 140.93 56.08