Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 2,960.55 488.53 16.5  
1 PURBA BARDHAMAN Galsi-I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Material Requisition To Resource Division RTOR000373/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.26 0.00 0 0
2 PURBA BARDHAMAN Galsi-I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Material Requisition To Resource Division RTOR000436/2023-2024 3835/BWD 01/09/2023 0 Resource Division 24.50 0.00 0 0
3 PURBA BARDHAMAN Galsi-I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Acceptance cum Formal Work Order for Additional work of Construction of CWR cum Pump House with MS Structural work, Substation, Chlorine Room etc, Laying of MS pipe and necessary allied works of Surface Based Purangan and 11 Nos Mouzas Sub Surface based Pipe W/S Scheme (JJM) under Galsi-I Block, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000124/2024-2025 1112/DWSD 02/08/2024 120 MANASH GHOSH 98.87 0.00 0 0
4 PURBA BARDHAMAN Galsi-I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 21.53 19 100
5 PURBA BARDHAMAN Galsi-I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Material Requisition To Resource Division RTOR000766/2023-2024 192/BWD 10/01/2024 0 Resource Division 24.50 0.00 0 0
6 PURBA BARDHAMAN Galsi-I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Quotation for new service connection at Purangan. BILL/01083/2024-2025 BP-2024-25-403 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.32 0.00 0 0
7 PURBA BARDHAMAN Galsi-I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Sub Surface Based Piped Water Supply Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation, Construction of CWR, Chlorine Room, Guard Room, Sub Station Building, High Lift Pump House Boundary walls with gates, land development, drain and internal pathway of PURANGAN Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME]_ 2ND CALL ORD/000459/2023-2024 3441/BWD 08/08/2023 730 MANASH GHOSH 1,312.95 401.09 30.55 65
8 PURBA BARDHAMAN Galsi-I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for OHR SITE of Zone-1, 2, & 3 at PURANGAN Water Supply Scheme [ BLOCK- Galsi-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000562/2024-2025 3099/CMD 11/12/2024 373 CHOUDHURY ENTERPRISE 38.16 0.00 0 32
9 PURBA BARDHAMAN Galsi-I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Formal Work Order for Additional work of Soil investigation & construction of CWR/Pump House etc, Land development of H/W Site,drain & internal Path Way, Concrete Road Restoration,FHTC with Platform with necessary allied Works of Sub Surface Based PURANGAN Pipe W/S Scheme (JJM) under Galsi - I Block, Dist - Purba- Bardhaman ,under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000163/2024-2025 1521/DWSD 11/11/2024 360 MANASH GHOSH 789.87 0.00 0 75
10 PURBA BARDHAMAN Galsi-I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Acceptance cum Formal Work Order for the work of Sinking of 3 Nos 300 x 200 mm dia T/W 150 mtr and 5 nos 200 x 200 mm dia River Bank T/W 51 mtr with Construction of 3 nos P/H cum switch room under chlorine room under PURANGAN PWSS (JJM), Block:- Galsi-I , Dist- Purba Bardhaman. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000309/2023-2024 372/DWSD 15/03/2024 90 MANASH GHOSH 90.55 65.91 72.79 53
11 PURBA BARDHAMAN Galsi-I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Supply, installation, commissioning of Electro-Mechanical and instrumentation components at newly constructed Boosting Station under Purangan & 11 nos. Mouza water supply scheme under Central Mechanical Division PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000774/2024-2025 479/CMD 06/02/2025 75 S.P. CONSTRUCTION 135.24 0.00 0 0
12 PURBA BARDHAMAN Galsi-I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Purangan & 11 nos. mouza Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000003/2025-2026 905/CMD 04/04/2025 75 WEST BENGAL ENGINEERING CO. 317.99 0.00 0 0
Total 2,960.54 488.53 16.5