Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 3,759.48 705.38 18.76  
1 PURBA BARDHAMAN Galsi-II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000380/2023-2024 2197/BWD 12/05/2023 0 Resource Division 8.77 0.00 0 0
2 PURBA BARDHAMAN Galsi-II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000537/2023-2024 4297/BWD 29/09/2023 0 Resource Division 1.83 0.00 0 0
3 PURBA BARDHAMAN Galsi-II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000553/2023-2024 4445/BWD 09/10/2023 0 Resource Division 14.51 0.00 0 0
4 PURBA BARDHAMAN Galsi-II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 21.53 19 100
5 PURBA BARDHAMAN Galsi-II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000765/2023-2024 198/BWD 10/01/2024 0 Resource Division 16.34 0.00 0 0
6 PURBA BARDHAMAN Galsi-II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New New service connection charges for Khano PWSS Z-I TW-2 BILL/00821/2024-2025 BP-2024-25-323 03/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.90 0.00 0 0
7 PURBA BARDHAMAN Galsi-II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Quotation for new service connection for Khano PWSS PH 3. BILL/00220/2024-2025 BP-2024-25-110 28/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.74 0.00 0 0
8 PURBA BARDHAMAN Galsi-II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Sub Surface Based Piped Water Supply Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation, Construction of CWR, Chlorine Room, Guard Room, Sub Station Building, High Lift Pump House Boundary walls with gates, land development, drain and internal pathway of KHANO Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL ORD/000496/2023-2024 3526/BWD 10/08/2023 820 MEGHDOOT GHOSH 1,088.86 305.99 28.1 55
9 PURBA BARDHAMAN Galsi-II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Acceptance cum Formal Work Order work oof Sinking of 3 Nos 300 x 200 mm dia T/W 150mtr and Construction of P/H cum switch room chlorine room (4 nos) under KHANO PWSS (JJM), Block- Galsi-II, Dist:- Purba Bardhaman. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000308/2023-2024 371/DWSD 15/03/2024 455 MEGHDOOT GHOSH 80.19 30.20 37.66 40
10 PURBA BARDHAMAN Galsi-II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Formal Work Order for Laying of Rising Main including Jack Pushing and construction of Pipe Carring Bridge with Pipe supporting structure under TAHERPUR and KHANO Piped Water Supply Scheme under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000158/2024-2025 1506/DWSD 05/11/2024 236 MANASH GHOSH 1,114.23 342.40 30.73 60
11 PURBA BARDHAMAN Galsi-II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Formal Work Order for Additional Work of Soil investigation and construction of CWR cum Pump House with M.S structural work, Substation, Chlorine Room etc. Land Development of H/W site, drain and internal path way, concrete road and Bituminous Road Restoration, laying of M.S pipe, FHTC with platfrom and necessary allied works of Sub Surface based Taherpur and Khano PWSS (JJM) under Galsi-II Block, Dist- Purba Bardhaman, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000161/2024-2025 1507/DWSD 05/11/2024 360 S & P ENTERPRISE 811.59 0.00 0 35
12 PURBA BARDHAMAN Galsi-II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Zone-1 & 2, T.W. No.- 1 & 2 at KHANO Water Supply Scheme [ BLOCK- Galsi-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000559/2024-2025 3089/CMD 10/12/2024 236 M.S. ENTERPRISE 50.29 0.00 0 24
13 PURBA BARDHAMAN Galsi-II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Taherpur & Khano Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000002/2025-2026 904/CMD 04/04/2025 75 SINHA ELECTRICALS 329.09 0.00 0 0
14 PURBA BARDHAMAN Galsi-II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Execution and payment of wayleave permission with railway services for crossing of portable water supply PWSSat Khano under Khano PWSS under DWSD,PHE Dte Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000011/2025-2026 657/DWSD 21/04/2025 195 MANASH GHOSH 7.09 5.26 74.19 71
15 PURBA BARDHAMAN Galsi-II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Supply, installation, commissioning of Electro-Mechanical and instrumentation components at newly constructed Boosting Station under Taherpur-khano sub surface water supply scheme under Central Mechanical Division PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000784/2024-2025 480/CMD 06/02/2025 75 GLACIER ENGINEERING CO 105.71 0.00 0 0
Total 3,759.48 705.39 18.76