Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
22 31,399.71 2,144.18 6.83  
1 MURSHIDABAD Berhampore Mechanical Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Providing Electrical Equipment for 11/0.433 KV Sub-station (LT Bulk & HT Bulk) at Intake and Water Treatment Plant under Augmentation of Central Sector, Part-I Surface Water Based W/S Scheme, Dist. Murshidabad ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/001569/2023-2024 973/MEDB 15/03/2024 184 CONCORD ENGINEERING 239.82 0.00 0 0
2 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Material Requisition To Resource Division RTOR000001/2024-2025 790/BD-I 09/05/2024 0 Resource Division 478.82 0.00 0 0
3 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Material Requisition To Resource Division RTOR000004/2024-2025 1341/BD-I/2 20/08/2024 0 Resource Division 387.17 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Material Requisition To Resource Division RTOR000006/2024-2025 1462/BD-I 05/09/2024 0 Resource Division 123.20 0.00 0 0
5 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Material Requisition To Resource Division RTOR000002/2024-2025 1148/BD-I 18/07/2024 0 Resource Division 817.87 0.00 0 0
6 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Material Requisition To Resource Division RTOR000005/2024-2025 1412/BD-I 30/08/2024 0 Resource Division 1,050.72 0.00 0 0
7 MURSHIDABAD Berhampore Mechanical Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation SHIFTING OF DTR 25KVA AT MANIKNAGAR CID 860311628 BILL/00663/2024-2025 03/09/2024 0 WBSEDCL 0.71 0.00 0 0
8 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Safety Checking of 9 (Nine) nos Over Head Reservoit at various places of Murshidabad District under P.H.Engineering Department, Govt of West Bengal. BILL/00347/2024-2025 BP-2024-25-259 27/11/2024 0 SRCC NIT DURGAPUR 3.54 0.00 0 0
9 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Rejuvanation of of 30.33 MLD Capacity Water Treatment Plant (Inlet well ,Flush Mixture ,Clarifoculator , Chemical Dosing and Filter House ) at Central Sector Part- I (At Lalbagh) Under Berhampore Division - I , In The District Murshidabad , PHE Dte . Assistant Engineer-I Junior Engineer-I ORD/000437/2023-2024 391/BD-I 12/03/2024 540 DHIMAN SARKAR 270.68 0.00 0 80
10 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation EXECUTION OF CLEAR WATER RISING MAIN, OVERHEAD RESERVOIRS WITH ALLIED WORKS, DISTRIBUTION NETWORK WITH FHTC COMPLETE FOR AUGMENTATION OF SURFACE WATER BASED PIPED WATER SUPPLY SCHEME FOR CENTRAL SECTOR PART-I OF MURSHIDABAD DISTRICT Assistant Engineer-I JE,Junior Engineer-I ORD/000435/2023-2024 387/BD-I 12/03/2024 849 M/S MOHAN LAL JAIN 7,952.07 1,331.31 16.74 60
11 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Withdrawing and Laying of different dia. D.I. pipe along NH12 from Bhakuri to Talbagan more with connection work to Rising Mains of Central Sector Part-II near Bhakuri more and Balarampur Halt Station under Berhampore Division-I, P.H.E. Dte. Assistant Engineer-I Junior Engineer-I ORD/000120/2024-2025 1469/BD-I 06/09/2024 240 SAMBHUNATH ROY 53.60 0.00 0 80
12 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for official use for the Office of the Assistant Engineer-II,BD-I,PHE Dte. [Period for 05.07.2024 to 30.06.2025.] Car No-WB58CC 9776 Assistant Engineer-II JE ORD/000046/2024-2025 1082/BD-I 04/07/2024 365 MD MUKLESUR RAHAMAN 1.81 4.79 264.64 0
13 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Allied Work for Supply of different types of specials in connection with execution of Clear Water Rising Main, Overhead Reservoirs, Distribution Network Complete under JJM for Augmentation of Surface Water Based Piped Water Supply Scheme of CENTRAL SECTOR PART-II under BERHAMPORE DIVISION - I in the district of MURSHIDABAD Assistant Engineer-II ORD/000266/2024-2025 2324/BD-I 26/12/2024 30 ECO PROTECTION ENGINEERS PVT LTD. 35.30 0.00 0 0
14 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation EXECUTION OF CLEAR WATER RISING MAIN, OVERHEAD RESERVOIRS WITH ALLIED WORKS, DISTRIBUTION NETWORK WITH FHTC COMPLETE FOR AUGMENTATION OF SURFACE WATER BASED PIPED WATER SUPPLY SCHEME FOR CENTRAL SECTOR PART-II OF MURSHIDABAD DISTRICT Assistant Engineer-II JE ORD/000436/2023-2024 388/BD-I 12/03/2024 872 ECO PROTECTION ENGINEERS PVT LTD. 16,059.70 808.08 5.03 35
15 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Survey, Investigation, Planning, Design, Execution commissioning and completion in all respect of all Civil, Electrical and Mechanical work of 11 MLD capacity conventional water treatment plant (WTP) using River Bhagirathi as source including Intake Structures, Raw Water rising main, and Clear Water rising main upto boundary limit of WTP for the Augmentation of surface water based piped water supply scheme for Murshidabad Central Sector (Part-I) in Murshidabad District under PHE Dte. including 12 (Twelve) months of Operation and Maintenance after successful completion of 3 (Three) months Trial Run Assistant Engineer-II Junior Engineer-I ORD/000434/2023-2024 386/BD-I 12/03/2024 549 CONCORD ENGINEERING 3,354.92 0.00 0 0
16 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Rejuvanation of 54.11 MLD Capacity Water Treatment Plant (Inlet well ,Flush Mixture,Clarifoculator, Chemical Dosing and Filter House ) at Central Sector Part-II UNDER BERHAMPORE DIVISION - I , IN THE DISTRICT MURSHIDABAD , PHE DTE . Assistant Engineer-II JE ORD/000432/2023-2024 385/BD-I 12/03/2024 477 CONCORD ENGINEERING 296.54 0.00 0 60
17 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Allied Work for Supply of different types of specials in connection with execution of Clear Water Rising Main, Overhead Reservoirs, Distribution Network Complete under JJM for Augmentation of Surface Water Based Piped Water Supply Scheme of CENTRAL SECTOR PART-I under BERHAMPORE DIVISION - I in the district of MURSHIDABAD. Assistant Engineer-I ORD/000256/2024-2025 2269/BD-I 16/12/2024 30 M/S MOHAN LAL JAIN 36.33 0.00 0 0
18 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Renovation and upgradation of all existing infrastructures (Filter House Building,Chemical House Building,Laboratory/SCADA Building,Clear Water Pump House, Clear Water Reservoir, Outhouse, Staff Quarters and allied Works) of Augumentation of Central Sector Part-II under JJM under Berhampore Division-I, P.H.E Dte. Assistant Engineer-II ORD/000272/2024-2025 2334/BD-I 30/12/2024 45 CONCORD ENGINEERING 59.47 0.00 0 0
19 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Improvement of existing Pump House & Construction of Boundary Wall at different head work sites for Augmentation of different PWSS within MJ & Berhampore Block under Central Sector Part-I under Jal Jeevan Mission under Berhampore Division-I PHE Dte. in the district Murshidabad. Assistant Engineer-I JE ORD/000142/2024-2025 1610/BD-I 03/10/2024 240 M/S J.S ENTERPRISE 85.47 0.00 0 40
20 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Renovation and upgradation of all existing infrastructures (Sludge Sump House, Sludge pond, Substation Building,Boundary Wall, Clariflocculator, Flash Mixer, Inlet Well and allied Works) of Augumentation of Central Sector Part-II under JJM under Berhampore Division-I, P.H.E Dte. Assistant Engineer-II ORD/000271/2024-2025 2333/BD-I 30/12/2024 45 CONCORD ENGINEERING 42.16 0.00 0 0
21 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Continuation Work order for Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for official use for the Office of the Assistant Engineer-II,BD-I,PHE Dte. [Period for 01.07.2025 to 31.10.2025.] Car No-WB58CC 9776 Assistant Engineer-II JE ORD/000095/2025-2026 1082/BD-I 30/06/2025 123 MD MUKLESUR RAHAMAN 0.60 0.00 0 0
22 MURSHIDABAD Berhampore Division I Augmentation of surface water based piped water supply scheme for arsenic affected areas of Murshidabad District (Central Sector) (Part-I & Part-II) , SM/19189 Augmentation Consultancy for Engineering support of six numbers of Suspended OHR constructed in stages initially during 2011-2012 and after 5-6 years gap in Berhampore Division-I of PHE Dte. based on Joint Inspection, Non-destructive Test and subsequent Structural Analysis of their As Built Numerical Models in FEM Platform including Seismic Considerations. Assistant Engineer-II ORD/000091/2025-2026 959/BD-I 22/07/2025 60 JADAVPUR UNIVERSITY 49.21 0.00 0 0
Total 31,399.71 2,144.18 6.83