Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 22,029.79 28.32 0.13  
1 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for RAMPARA FORIDPUR Water Supply Scheme of BELDANGA-II Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-II JE_Pravin Kumar Gupta ORD/000191/2023-2024 720/BD-I 14/08/2023 10 TECHVISION 2.81 2.81 100 100
2 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation Material Requisition To Resource Division RTOR000107/2023-2024 201/BD-1/8 10/02/2024 0 Resource Division 36.69 0.00 0 0
3 MURSHIDABAD Berhampore Mechanical AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation NEW CONNECTION AT RAMPARA FARIDPUR PH-1 BILL/00615/2024-2025 182/WBSEDCL-JJM 09/08/2024 0 WBSEDCL 3.66 0.00 0 0
4 MURSHIDABAD Central Drilling AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 15.06 0.07 11
5 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation Augmentation of Rampara Faridpur Piped water supply scheme to accommodate construction of OHR ,Arsenic cum Iron Removal Plant(AIRP) and service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Beldanga -II Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer-II JE ORD/000288/2023-2024 1017/BD-I 31/10/2023 793 SANJAY BISWAS 558.97 10.45 1.87 65
6 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation RAMPARA FARIDPUR PWSS to accommodate construction of Boundary Wall under Jal Jivan Mission of BELDANGA-II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-II JE ORD/000456/2023-2024 460/BD-I 15/03/2024 480 SAHA CONSTRUCTION 22.63 0.00 0 75
7 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Rampara Faridpur Water Supply Scheme in connection with Augmentation work under Berhampore Division - I, P.H.Engineering Dte Assistant Engineer-II JE ORD/000253/2024-2025 2249/BD-I 10/12/2024 30 M/S B.R. SUPPLIERS 9.00 0.00 0 0
8 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation RAMPARA FARIDPUR PWSS to accommodate construction of Pump House Cum Chlorine Room, under Jal Jeevan Mission within BELDANGA-II Block in the district of Murshidabad under Berhampore Division-I, PHE.Dte. Assistant Engineer-II ORD/000382/2024-2025 444/BD-I 20/03/2025 45 DATA ENTERPRISE 9.84 0.00 0 0
9 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation Improvement of Existing AIRP (Capacity 68 Cum/hr.) with allied work at Rampara Faridpur (Zone-I) Water Supply Scheme under Jal Jeevan Mission within Beldanga - II under Berhampore Division-I, P.H.Engineering Dte. In the district of Murshidabad. Assistant Engineer-II ORD/000050/2025-2026 759/BD-I 22/05/2025 30 SANJAY BISWAS 27.45 0.00 0 0
10 MURSHIDABAD Berhampore Division I AUGMENTATION OF RAMPARA FARIDPUR PIPED WATER SUPPLY SCHEME. , SM/18603 Augmentation Construction of Pump House Cum Chlorine Room with boundary wall at 2nd Tube Well Site of RAMPARA FARIDPUR ZONE - II PWSS under Jal Jeevan Mission within Beldanga-II Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad. Assistant Engineer-II ORD/000021/2025-2026 638/BD-I 25/04/2025 60 MASTER CONSTRUCTION 18.98 0.00 0 0
Total 22,029.79 28.31 0.13