Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 646.21 448.53 69.41  
1 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Continuation work order for Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for ANDULBERIA Water Supply Scheme of BELDANGA-II Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_RAJIB BISWAS ORD/000296/2022-2023 1648/BD-I 10/03/2023 10 TECHVISION 2.81 2.80 99.64 100
2 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Allied works of Laying of distribution pipeline of ANDULBERIA ZONE-I piped water supply scheme under JJM within Beldanga-II Block in the district of Murshidabad under Berhampore Division-I, PHE Dte. Assistant Engineer-II ORD/000127/2024-2025 1477/BD-I 06/09/2024 60 SUSHANTA MANDAL 45.66 0.00 0 0
3 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Material Requisition To Resource Division RTOR000089/2023-2024 196/BD-I/23 09/02/2024 0 Resource Division 64.29 0.00 0 0
4 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Augmentation of Andulberia Zone_I Piped water supply scheme to accommodate construction of service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Beldanga-II Block of Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer-II Junior Engineer-I ORD/000255/2022-2023 1661/BD-I 13/03/2023 720 M/S BIMALENDU BOSE 433.78 433.17 99.86 100
5 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Construction of Boundary wall at 2nd & 3rd Tube Well Site of ANDULBERIYA ZONE -I PWSS under Jal Jeevan Mission within Beldanga-II Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad. Assistant Engineer-II ORD/000013/2025-2026 600/BD-I 22/04/2025 60 AICH CONSTRUCTION 20.36 0.00 0 0
6 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Repair And Renovation Works Of R.C.C Elevated Reservoir (700 Cum) for Andulberia Zone-I water supply scheme of Beldanga-II block under Berhampore Division-I PHE Dte. in the district Murshidabad. Augmentation of PWSS under Jal Jeevan Mission. Assistant Engineer-II JE ORD/000360/2023-2024 18/BD-I 04/01/2024 328 A.S CONSTRUCTION 11.02 0.00 0 100
7 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at ANDULBERIA ZONE-I Water Supply Scheme(TW-II) within Beldanga-II Block under JJM in connection with Augmentation work under Berhampore Division - I, P.H.Engineering Dte. Assistant Engineer-II JE ORD/000278/2024-2025 12/BD-I 06/01/2025 195 MAMATA USHA ENTERPRISE 9.01 0.00 0 100
8 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Replacement of Filter media of Existing AIRP of (Capacity 139 Cum/hr.) with allied work at Andulberia Zone-I Water Supply Scheme under Jal Jeevan Mission under Berhampore Division-I, PHEengineering Dte. Assistant Engineer-II JE ORD/000015/2024-2025 916/BD-I 07/06/2024 150 M/S GOUTAM CHAKRABORTY 47.44 12.56 26.48 100
9 MURSHIDABAD Berhampore Division I AUGMENTATION OF ANDULBERIA ZONE-I PIPED WATER SUPPLY SCHEME. , SM/14921 Augmentation Balance work for Improvement of Existing AIRP of (Capacity 139 Cum/hr,with allied work at Andulberia Zone-IWater Supply Scheme under Jal Jeevan Mission within Beldanga - II under Berhampore Division-I,P.H.Engineering Dte. In the district of Murshidabad. Assistant Engineer-II JE ORD/000054/2025-2026 763/BD-I 22/05/2025 30 M/S GOUTAM CHAKRABORTY 11.84 0.00 0 100
Total 646.21 448.53 69.41