Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 294.81 198.56 67.35  
1 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bhundar Kismat , SM/12578 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augmentation in connection to Accommodate FHTC at Pump House No.-I of BUNDHAR KISMAT ground water based water supply scheme under Block- Bhagawangola-I, Dist. Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000816/2023-2024 3766/MEDB 03/11/2023 92 GANGULI ELECTRICAL CO. 11.19 9.30 83.11 10
2 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bhundar Kismat , SM/12578 Augmentation Material Requisition To Resource Division RTOR000059/2023-2024 196/BD-I/6 09/02/2024 0 Resource Division 48.07 0.00 0 0
3 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bhundar Kismat , SM/12578 Augmentation BHUNDAR KISMAT PWSS BILL/01451/2023-2024 350/WBSEDCL-JJM 15/02/2024 0 WBSEDCL 7.83 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bhundar Kismat , SM/12578 Augmentation Augmentation of Bhundar kismat Piped water supply scheme to accommodate construction of pump house ,boundary wall and service road, laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Bhagwangola-I Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer-I Junior Engineer-I ORD/000201/2022-2023 1617/BD-I 02/03/2023 180 DHIRENDRA NATH MONDAL 222.61 186.56 83.81 60
5 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bhundar Kismat , SM/12578 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for BHUNDAR KISMAT Water Supply Scheme of BHAGAWANGOLA-I Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE ORD/000885/2021-2022 268/BD-I 08/03/2022 10 CIVIL & ENVIRONMENTAL ENGINEERING DESIGN SOLUTIONS 2.70 2.70 100 0
6 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bhundar Kismat , SM/12578 Augmentation Repair and renovation of existing Pump House (Head work/2nd site) and Allied Works for Bhundar Kismat ground Water Supply Scheme" under Berhampore Division-I, PHE Dte. (Block-Bhagwangola-I) Assistant Engineer-I Junior Engineer-I ORD/000106/2022-2023 1362/BD-I 21/12/2022 630 GHOSH BUILDERS 2.41 0.00 0 100
Total 294.81 198.55 67.35