Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 1,284.14 154.05 12  
1 MURSHIDABAD Samserganj Murshidabad Division KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Material Requisition To Resource Division RTOR000286/2023-2024 1230/MURD/29 04/05/2023 0 Resource Division 22.56 0.00 0 0
2 MURSHIDABAD Samserganj Berhampore Mechanical KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-I ,II & III under KOHETPUR ground water based water supply scheme under Block_ Samsedganj Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000690/2023-2024 4304/MEDB 29/12/2023 91 BHABANI PRASAD MANNA 32.99 0.00 0 0
3 MURSHIDABAD Samserganj Murshidabad Division KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Material Requisition To Resource Division RTOR000373/2023-2024 495/MURD/08 15/02/2024 0 Resource Division 8.37 0.00 0 0
4 MURSHIDABAD Samserganj Berhampore Mechanical KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New NEW CONNECTION AT KOHETPUR PH-II BILL/00422/2024-2025 143/WBSEDCL-JJM 08/07/2024 0 WBSEDCL 4.17 0.00 0 0
5 MURSHIDABAD Samserganj Berhampore Mechanical KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New NEW CONNECTION AT KOHETPUR PH-I BILL/00423/2024-2025 144/WBSEDCL-JJM 08/07/2024 0 WBSEDCL 4.92 0.00 0 0
6 MURSHIDABAD Samserganj Murshidabad Division KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New COST OF RESTORATION OF ROAD CONNECTTED TO NH-34 DHULIAN PAKUR ROAD AT CH. 4.275 TO 4.600. BILL/01019/2024-2025 369-MSD/2024-20 12/09/2024 0 MURSHIDABAD HIGHWAY DIVISION-1 13.30 0.00 0 0
7 MURSHIDABAD Samserganj Murshidabad Division KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Sagarpara Part-A, Kohetpur and Napara Water Supply Scheme under Islampur & Jangipur Sub-Division, Murshidabad Division, P.H.Engineering Dte. ASSISTANT ENGINEER ORD/000668/2022-2023 3409/MURD 22/12/2022 45 R.K. DRILLING SERVICES 23.56 0.00 0 0
8 MURSHIDABAD Samserganj Murshidabad Division KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Formal work order for the work of KOHETPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission of SAMSERGANJ Block, Murshidabad District under Murshidabad Division, PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 2 ORD/000812/2022-2023 670/MURD 09/03/2023 762 PRAFULLYA CONSTRUCTION 379.82 141.31 37.2 22
9 MURSHIDABAD Samserganj Central Drilling KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Construction of Big diameter Tube-Well by Deployment of Suitable capacity Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different District for Different Water Supply Schemes Including Procurement & Installation Pumping machinery with All Allied accessories at the Above Constructed Tube - Wells under JJM Program throughout the State of West Bengal. (2nd call of NIET 25 of 2022-23). Assistant Engineer,Driller In Charge Junior Engineer ORD/000022/2024-2025 492/CDD 23/07/2024 92 JHARGRAM SPV PRIVATE LIMITED 458.70 7.58 1.65 10
10 MURSHIDABAD Samserganj Murshidabad Division KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Sinking of 07 (Seven) Nos of 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Paschim Purnopara Zone-II T.W-I,II,III Chandnidaha T.W-II, Kohetpur T.W-III, Prosadpur Zone-II T.W-I,II, Water Supply Scheme under Jangipur Sub-Division, Murshidabad Division, P.H.Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1,JUNIOR ENGINEER 2 ORD/000497/2024-2025 660/MURD 19/03/2025 90 JOY GURU ENTERPRISE 82.50 0.00 0 0
11 MURSHIDABAD Samserganj Murshidabad Division KOHETPUR PIPE WATER SUPPLY SCHEME. , SM/15945 New Preparation of DPR for drinking water supply scheme to facilitate 63 Nos (List Enclosed) Uncovered mouzas of Jangipur Sub-Division [Raghunathganj-I, Raghunathganj-II, Suti-I, Suti-II, Farakka, Samserganj Block] which includes Route survey using DGPS/Drone/Total Station etc. & all related field work for technical data collection, Household Survey using PHED developed mobile application, Preparation and supply of Geo reference drawing / layout plan of the zone-wise Command area of water distribution and transmission Pipeline network of the schemes showing all requisite features, design of Pipeline Network. Design (if necessary), drawing & estimation of all necessary structures, Preparation & Submission of DPR booklets & Bid Document ( in both hard and soft copies) including Preparation of Booklet for SLSSC for individual PWSS, all complete in consultation with the EIC under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000578/2022-2023 3001/MURD 11/11/2022 45 RADIANT 253.25 5.16 2.04 100
Total 1,284.12 154.05 12