Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 575.98 30.35 5.27  
1 MURSHIDABAD Samserganj Murshidabad Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New Material Requisition To Resource Division RTOR000268/2023-2024 1230/MURD/11 04/05/2023 Resource Division 22.61 0.00 0 0
2 MURSHIDABAD Samserganj Murshidabad Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New Preparation of DPR for drinking water supply scheme to facilitate 63 Nos (List Enclosed) Uncovered mouzas of Jangipur Sub-Division [Raghunathganj-I, Raghunathganj-II, Suti-I, Suti-II, Farakka, Samserganj Block] which includes Route survey using DGPS/Drone/Total Station etc. & all related field work for technical data collection, Household Survey using PHED developed mobile application, Preparation and supply of Geo reference drawing / layout plan of the zone-wise Command area of water distribution and transmission Pipeline network of the schemes showing all requisite features, design of Pipeline Network. Design (if necessary), drawing & estimation of all necessary structures, Preparation & Submission of DPR booklets & Bid Document ( in both hard and soft copies) including Preparation of Booklet for SLSSC for individual PWSS, all complete in consultation with the EIC under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000578/2022-2023 3001/MURD 11/11/2022 45 RADIANT 253.25 0.00 0 100
3 MURSHIDABAD Samserganj Murshidabad Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New Material Requisition To Resource Division RTOR000383/2023-2024 495/MURD/14 15/02/2024 Resource Division 5.03 0.00 0 0
4 MURSHIDABAD Samserganj Berhampore Mechanical NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New NEW CONNECTION AT NAPARA PH-II BILL/00226/2024-2025 null 29/04/2024 WBSEDCL 11.52 0.00 0 null
5 MURSHIDABAD Samserganj Berhampore Mechanical NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New NEW CONNECTION AT NAPARA PH-II BILL/00221/2024-2025 60/WBSEDCL-JJM 06/05/2024 WBSEDCL 11.52 0.00 0 0
6 MURSHIDABAD Samserganj Berhampore Mechanical NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-I & II under NAPARA ground water based water supply scheme under Block_ Samserganj Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000696/2023-2024 3808/MEDB 03/11/2023 90 ORIENTAL ENGINEERING CO. 20.86 0.00 0 10
7 MURSHIDABAD Samserganj Murshidabad Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New Sinking of 01 (One) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at NAPARA Water Supply Scheme at Head Work Site, 2nd Site site at Samserganj Block under Murshidabad Division, P.H. Engineering Dte ASSISTANT ENGINEER JUNIOR ENGINEER 2,JUNIOR ENGINEER 6 ORD/000621/2023-2024 3408/MURD 02/11/2023 21 TAPAN DAS 9.28 3.98 42.89 100
8 MURSHIDABAD Samserganj Murshidabad Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/15051 New Formal work order for the work of NAPARA PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission, Samserganj Block of Murshidabad District under Jangipur Sub-Division, Murshidabad Division, PHE.Dte. ASSISTANT ENGINEER ASSISTANT ENGINEER,JUNIOR ENGINEER 2 ORD/000735/2022-2023 376/MURD 10/02/2023 365 MANDAL CONSTRUCTION AND CO. 241.91 26.37 10.9 45
Total 575.99 30.34 5.27