Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 906.15 347.73 38.37  
1 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Preparation of D.P.R(Consultancy work)in connection with the Functional House Hold Connection of different existing PWSS (MALIBARI PWSS Scheme, Block - Raninagar-II) to be Augmentation/Rejuvination under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000831/2021-2022 3264/MURD 05/10/2021 60 RADIANT 5.89 5.89 100 1
2 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Material Requisition To Resource Division RTOR000053/2022-2023 3052/F/MURD 17/11/2022 Resource Division 23.33 0.00 0 0
3 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Sinking of 01 (One) No of 250mm x 150 mm dia Repalcement tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Malibari Water Supply Scheme of 3rd TW Site under Islampur Sub-Division, Murshidabad Division, P.H.Engineering Dte. ASSISTANT ENGINEER ORD/000581/2022-2023 3064/MURD 17/11/2022 30 SUJIT KUMAR SAHA 9.21 8.09 87.84 0
4 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Material Requisition To Resource Division RTOR000110/2023-2024 1167/MURD/3 28/04/2023 Resource Division 27.60 0.00 0 0
5 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Formal work order for laying Distribution System (HDPE Pipe) of for AUGMENTATION of Ground Water Based MALIBARI PWSS to Accommadate FHTC at Raninagar- II Block in the District of Murshidabad, under Murshidabad Division, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000170/2022-2023 1316/MURD 20/05/2022 120 NAYLA CONSTRUCTION 217.49 183.08 84.18 100
6 MURSHIDABAD Berhampore Mechanical Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augmentation in connection to Accommodate FHTC at Pump House No.-III of Malibari ground water based water supply scheme under Block- Raninagar-II, Dist. Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000833/2023-2024 3774/MEDB 03/11/2023 90 ARINDAM MAJUMDAR 11.02 0.00 0 0
7 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Material Requisition To Resource Division RTOR000021/2022-2023 2507/C/MURD 31/08/2022 Resource Division 9.22 0.00 0 0
8 MURSHIDABAD Berhampore Mechanical Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation NEW SERVICE CONNECTION AT MALIBARI PHI, ID304238384 BILL/01219/2023-2024 287/WBSEDCL-JJM 24/01/2024 WBSEDCL 12.87 0.00 0 0
9 MURSHIDABAD Berhampore Mechanical Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation NEW SERVICE CONNECTION AT MALIBARI PHI, ID304238384 BILL/01219/2023-2024 287/WBSEDCL-JJM 24/01/2024 WBSEDCL 12.87 0.00 0 0
10 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Formal work order for Functional Household Tap Connections (FHTC) in Bilchatra & Malibari Village ( Village Code -314568 ,314569 ) in connection with Augmentation of Malibari Ground Water Based Water Supply Scheme Raninagar-II Block under Murshidabad Division P.H.E Dte. ASSISTANT ENGINEER Junior Engineer,JUNIOR ENGINEER 5 ORD/000686/2022-2023 163/MURD 17/01/2023 60 KUNDU CONSTRUCTION 170.31 145.56 85.47 95
11 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Retrofitting Providing Functional Household Tap Connections (FHTC) in connection with Jal Swapna (Jal Jeevan Mission ) and under command area of village of Bilchatra (Village Code -314568) under Malibari Ground Water Based Water Supply Scheme for Arsenic Affected Areas of Raninagar - II Block under Murshidabad Division P.H.E Dte. (Scheme I.D.-0005184027) ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000714/2020-2021 581/MURD 09/02/2021 60 ULTRA CONSTRUCTION. 27.70 5.11 18.45 1
12 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Balance & Allied Work for Laying Distribution System , FHTC of Malibari Water Supply Scheme in Raninagar-II Block ,under Murshidabad Division , PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000055/2024-2025 1986/MURD 08/07/2024 60 DAS TRADING CO. 95.72 0.00 0 0
13 MURSHIDABAD Murshidabad Division Augmentation Of Ground Water Based Malibari PWSS To Accommodate FHTC In Raninagar-II Block Within Murshidabad District Under Murshidabad Division, PHE DTE. , SM/10011 Augmentation Construction of Two nos Pump House cum Chlorine Room with sanitary and Water Supply Arrangement ,Construction of Boundary Wall of 200 m, Construction of RCC approach road (3 Mtr Wide)of 100 mtr length, Laying of Rising Main, Construction of 450 Cum OHR, Special repair and renovation of existing 2 (Two) Nos Pump House and Allied Works and Land Development Works for Augmentation of Malibari Water Supply scheme at Raninagar-II Block under Murshidabad Division,PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 5 ORD/000024/2024-2025 1816/MURD 20/06/2024 300 M/S B.M. INDUSTRIES 282.92 0.00 0 0
Total 906.14 347.73 38.37