Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 668.04 67.87 10.16  
1 MALDAH Kaliachak-I Malda Mechanical Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I & II and Arsenic Iron Removal Plant at Gayeshbari Piped Water Supply Scheme in the district of Malda Under Malda Mechanical Division, PHE Dte. (TSM/018180) Assistant Engineer - II ORD/000656/2023-2024 2685/MLMD 11/08/2023 180 SUNRISE ENGINEERING CORPORATION. 63.77 0.00 0 0
2 MALDAH Kaliachak-I Malda Ars Area W/S Division Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Laying of Distribution System including Supply of all type of specials & valves for Gayeshbari Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-I,Assistant Engineer-II Junior Engineer-II ORD/000276/2023-2024 3076/MAAD 14/12/2023 361 FUTURE 96.70 0.00 0 35
3 MALDAH Kaliachak-I Malda Ars Area W/S Division Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Construction of Boundary Wall at Head Work Site & 2nd Tube Well Site, Laying of rising main from 2nd Tube Well Site to HWS including supply of all specials & valves and Providing Functional House Hold Tap Connection (FHTC) for Gayeshbari Piped Water Supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E. Dte, Malda. Assistant Engineer-I Junior Engineer-II ORD/000239/2024-2025 1693/MAAD 19/11/2024 60 M/S MOON LIGHT CONSTRUCTION & CO. 75.67 0.00 0 0
4 MALDAH Kaliachak-I Malda Ars Area W/S Division Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Sinking of Two nos 250mm. Dia. x 150mm. big dia. Tube Well of 150 Mtr. deep by Direct Rotary Rig method using UPVC (CM) Pipes & UPVC Medium Well Screen (RMS) Pipes with Ribs for Gayeshbari Piped Water supply scheme (Head Work Site & 2nd Tube Well Site) at Kaliachak-I Block under Malda Arsenic Area Water Supply Division , P.H.E. Dte., Malda (2nd Call) Assistant Engineer-II Junior Engineer-II ORD/000137/2023-2024 1478/MAAD 01/08/2023 45 ASHIS CONSTRUCTION 14.64 9.19 62.77 50
5 MALDAH Kaliachak-I Malda Mechanical Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Quotation Payment for Gayeshbari under SUJAPUR CCC in the District Of Malda BILL/03551/2023-2024 BP-2023-24-564 16/02/2024 0 W.B.S.E.D.C.LTD 7.72 0.00 0 0
6 MALDAH Kaliachak-I Malda Ars Area W/S Division Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Laying of Distribution System at Nayabasti, Jamirghata Station Road for Gayeshbari Piped Water supply scheme at Kaliachak-I Block under Malda Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-I,Assistant Engineer-II Junior Engineer-II ORD/000273/2023-2024 3073/MAAD 14/12/2023 60 GHOSH CONSTRUCTION 18.00 12.77 70.94 100
7 MALDAH Kaliachak-I Malda Ars Area W/S Division Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design & Drawing including pipe connection, Soil Investigation and Providing Functional House Hold Tap Connection (FHTC) for Gayeshbari Piped Water Supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E. Dte, Malda. (2ND Call) Assistant Engineer-I,Assistant Engineer-II Junior Engineer-II ORD/000280/2023-2024 3082/MAAD 14/12/2023 688 MAHBUB AND SONS 225.34 45.91 20.37 75
8 MALDAH Kaliachak-I Malda Ars Area W/S Division Gayeshbari mouza piped water supply Scheme of Kaliachak-I block under Malda Arsenic Area water supply Division, PHED , SM/15947 New Construction of Arsenic-cum-Iron Removal Plant (AIRP) for Gayeshbari Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. in the District of Malda. (2nd Call) Assistant Engineer-I,Assistant Engineer-II Junior Engineer-II ORD/000362/2023-2024 52/MAAD 18/01/2024 439 WIST WATER SOLUTIONS PRIVATE LIMITED 166.20 0.00 0 1
Total 668.02 67.87 10.16