Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 611.98 120.03 19.61  
1 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Route survey & design for praparation of DPR of Mosimpur, Khaschandpur & Gayeshbari Pipe Water Supply Scheme at Kaliachak-I Development Block under Malda Arsenic Area W/S Division, Phe Dte. Assistant Engineer-II Junior Engineer-II ORD/000231/2022-2023 1666/MAAD 08/09/2022 10 FUTURE 0.99 0.99 100 1
2 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Continuation work order for Route survey & design for praparation of DPR of Mosimpur, Khaschandpur & Gayeshbari Pipe Water Supply Scheme at Kaliachak-I Development Block under Malda Arsenic Area W/S Division, Phe Dte. Assistant Engineer-II Junior Engineer-II ORD/000288/2022-2023 1670/MAAD 12/09/2022 10 FUTURE 0.99 0.99 100 1
3 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Material Requisition To Resource Division RTOR000001/2023-2024 623/MAAD 05/04/2023 Resource Division 21.69 0.00 0 0
4 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Construction of Arsenic-cum-Iron Removal Plant (AIRP) for Mosimpur Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. in the District of Malda.(2nd Call) Assistant Engineer-II Junior Engineer-II ORD/000021/2023-2024 857/MAAD 03/05/2023 365 USHA ENTERPRISE 168.70 0.00 0 0
5 MALDAH Kaliachak - I Malda Mechanical Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Supply, delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I & II and Arsenic Iron Removal Plant at Masimpur Piped Water Supply Scheme in the district of Malda Under Malda Mechanical Division, PHE Dte. (TSM/015617) Assistant Engineer - II ORD/000679/2023-2024 2698/MLMD 11/08/2023 180 DEY ENTERPRISE [HOWRAH] 71.33 0.00 0 0
6 MALDAH Kaliachak - I Malda Mechanical Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of Masimpur, Sujapur C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000770/2023-2024 3004390333 10/08/2023 90 W.B.S.E.D.C.LTD 3.17 3.17 100 100
7 MALDAH Kaliachak - I Malda Mechanical Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New W.B.S.E.D.C.LTD Quotation charge at P/H No. II of Masimpur, Sujapur C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000769/2023-2024 3004395276 16/08/2023 90 W.B.S.E.D.C.LTD 5.97 5.97 100 100
8 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Sinking of Two nos 250mm. Dia. x 150mm. big dia. Tube Well of 150 Mtr. deep by Direct Rotary Rig method using UPVC (CM) Pipes & UPVC Medium Well Screen (RMS) Pipes with Ribs for Mosimpur Piped Water supply scheme (Head Work Site & 2nd Tube well site) at Kaliachak-I Block under Malda Arsenic Area Water Supply Division , P.H.E. Dte., Malda Assistant Engineer-II Junior Engineer-II ORD/000364/2022-2023 155/MAAD 02/02/2023 45 A ONE ENTERPRISE 14.72 10.38 70.52 100
9 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Laying of Distribution System at Mosimpur Madrasha Para, Jolakandi Para, Jolakandi Mokdompur Para, Post Office Para, School Para, Baliharpur East, Baliharpur West for Mosimpur Piped Water supply scheme at Kaliachak-I under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. (2nd call) Assistant Engineer-II Junior Engineer-II ORD/000377/2023-2024 222/MAAD 27/02/2024 90 MANIK CHOUDHURY 3.73 1.85 49.6 90
10 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Laying of Distribution System at Mosimpur Madrasha Para, Jolakandi Para, Jolakandi Mokdompur Para, Post Office Para, School Para, Baliharpur East, Baliharpur West for Mosimpur Piped Water supply scheme at Kaliachak-I under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. (2nd call) Assistant Engineer-II Junior Engineer-II ORD/000450/2022-2023 399/MAAD 06/03/2023 90 MANIK CHOUDHURY 70.26 44.66 63.56 80
11 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Laying of Distribution System at Mosimpur Chama Para, Beltala, Biswas Para, Darga Para, Khursed Para, Wayesh Mistry Para, Balupur, Baliharpur Rilif Pukur Para for Mosimpur Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-II Junior Engineer-II ORD/000375/2022-2023 222/MAAD 03/02/2023 90 SAHA CONSTRUCTION 33.71 18.90 56.07 95
12 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design & Drawing including pipe connection, Soil Investigation and Providing Functional House Hold Tap Connection (FHTC) for Mosimpur Piped Water Supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E. Dte, Malda. .(3rd Call) Assistant Engineer-II Junior Engineer-II ORD/000217/2023-2024 1705/MAAD 20/09/2023 270 A. K. CONSTRUCTION 211.70 30.77 14.53 20
13 MALDAH Kaliachak - I Malda Ars Area W/S Division Masimpur Mouza Piped Water supply scheme of Kaliachak-I block under Malda Arsenic area Water Supply Division, PHED , SM/13451 New Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Mosimpur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-II Junior Engineer-II ORD/000365/2022-2023 108/MAAD 30/01/2023 60 MD WARESH ALI 5.02 2.35 46.81 100
Total 611.97 120.01 19.61