Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 14.74 0 0  
1 MALDAH Malda Division Operation & Maintenance of PHED Managed Laboratories under Malda Division for Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19086 Support-WQMSP Continuation work order for Engagement of Chemist, Bacteriologist and Laboratory Assistant including related upkeeping works for Gazole Sub-District Laboratory under Malda Division, PHE Dte. In the district of Malda. (Period from 01/04/2024 to 30/09/2024). Mr. Amit Biswas, Assistant Engineer Biswajit Gosh, Junior Engineer ORD/001058/2023-2024 1371/MD 15/03/2024 183 M/S MAHABIR ENTERPRISE 2.98 0.00 0 100
2 MALDAH Malda Division Operation & Maintenance of PHED Managed Laboratories under Malda Division for Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19086 Support-WQMSP Continuation work order for Regular Upkeepment, upgradation of Mobile Laboratory Van complete with internal fabrication, refrigeration, exhaust system, air conditioning system, waste disposal system and fully equipped with instruments, devices, consumables, reagents, accessories and safety gear for Water Quality Monitoring and Surveillance Program under Malda Division PHE Dte. (Period from 01/01/2025 to 31/01/2025). Mr. Debasis Pal, Assistant Engineer Shreya Das, Junior Engineer ORD/000810/2024-2025 6626/MD 31/12/2024 31 SUNANDA ENVIROMENTAL INTERNATIONAL PVT. LTD. 2.10 0.00 0 100
3 MALDAH Malda Division Operation & Maintenance of PHED Managed Laboratories under Malda Division for Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19086 Support-WQMSP Continuation work order for Regular Upkeepment, upgradation of Mobile Laboratory Van complete with internal fabrication, refrigeration, exhaust system, air conditioning system, waste disposal system and fully equipped with instruments, devices, consumables, reagents, accessories and safety gear for Water Quality Monitoring and Surveillance Program under Malda Division PHE Dte. (Period from 01/11/2024 to 31/12/2024). Mr. Debasis Pal, Assistant Engineer Shreya Das, Junior Engineer ORD/000596/2024-2025 5549/MD 29/10/2024 61 SUNANDA ENVIROMENTAL INTERNATIONAL PVT. LTD. 4.19 0.00 0 100
4 MALDAH Malda Division Operation & Maintenance of PHED Managed Laboratories under Malda Division for Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19086 Support-WQMSP Engagement of Chemist, Bacteriologist and Laboratory Assistant including related upkeeping works for Sahapur Sub-District Laboratory (erstwhile PBVM) under Malda Division, PHE Dte. in the district of Malda. (Period from 01/10/2024 to 30/09/2025). Mr. Debasis Pal, Assistant Engineer Bikash Balo, Junior Engineer,Junior Engineer, ORD/000493/2024-2025 5186/MD 30/09/2024 365 M/S RAKHI ENTERPRISE 5.47 0.00 0 100
Total 14.75 0.00 0