Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 978.65 393.05 40.16  
1 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Morgram Water Supply Scheme under Old Malda Block under Malda Division, PHE Dte. in the district of Malda. Mr. Debasis Pal, Assistant Engineer Bikash Balo, Junior Engineer ORD/000639/2024-2025 5918/MD 26/11/2024 45 NEOGI ENTERPRISE 81.80 0.00 0 0
2 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Jack Pushing of M.S. pipe of 200 mm dia. through 600 mm dia M.S. pipe by Hydraulic Jacking Technique method through RLY. Track at KM 8/5 to 8/6 between Malda Court Station (MLFC) to Shingabad Station(SQB) for MORGRAM and it's adjoining Mouzas Water Supply Scheme under Malda Division, PHE Dte. in the district of Malda. Mr. Amit Biswas, Assistant Engineer,Mr. Debasis Pal, Assistant Engineer Bikash Balo, Junior Engineer ORD/000606/2023-2024 4110/MD 10/10/2023 397 RAY CONSTRUCTION CO. 20.07 0.30 1.49 100
3 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Material Requisition To Resource Division RTOR000185/2023-2024 810/MD 21/02/2024 0 Resource Division 66.34 0.00 0 0
4 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Material Requisition To Resource Division RTOR000149/2023-2024 238/MD 10/01/2024 0 Resource Division 16.12 0.00 0 0
5 MALDAH Maldah (Old) Malda Mechanical MORGRAM PWSS , SM/18557 New W.B.S.E.D.C.LTD Quotation charge at TW No- I of Morgram, Old Malda CCC in the dist of Malda Under Malda Mechanical Division PHE Dte. BILL/03509/2023-2024 BP-2023-24-529 15/02/2024 0 W.B.S.E.D.C.LTD 12.58 0.00 0 0
6 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Jack Pushing of M.S. pipe of 200 mm dia. through 600 mm dia M.S. pipe by Hydraulic Jacking Technique method through RLY. Track at KM 8/5 to 8/6 between Malda Court Station (MLFC) to Shingabad Station(SQB) for MORGRAM and it's adjoining Mouzas Water Supply Scheme under Malda Division, PHE Dte. in the district of Malda. BILL/01128/2023-2024 BP-2023-24-603 28/03/2024 0 RAIL BHOOMI CROSSING SEVA (IR-RBCS), NORTHEAST FRONTIER RAILWAY KATIHAR DIVISION 4.28 0.00 0 0
7 MALDAH Maldah (Old) Malda Mechanical MORGRAM PWSS , SM/18557 New W.B.S.E.D.C.LTD Quotation charge at TW No- II of Morgram, Old Malda CCC in the dist of Malda Under Malda Mechanical Division PHE Dte. BILL/03510/2023-2024 BP-2023-24-530 15/02/2024 0 W.B.S.E.D.C.LTD 10.78 0.00 0 0
8 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Jack Pushing of M.S. pipe of 200 mm dia. through 600 mm dia M.S. pipe by Hydraulic Jacking Technique method through RLY. Track at KM 8/5 to 8/6 between Malda Court Station (MLFC) to Shingabad Station(SQB) for MORGRAM and it's adjoining Mouzas Water Supply Scheme under Malda Division, PHE Dte. in the district of Malda. BILL/00851/2023-2024 BP-2023-24-461 02/02/2024 0 RAIL BHOOMI CROSSING SEVA (IR-RBCS), NORTHEAST FRONTIER RAILWAY KATIHAR DIVISION 0.05 0.00 0 0
9 MALDAH Maldah (Old) Malda Mechanical MORGRAM PWSS , SM/18557 New W.B.S.E.D.C.LTD Quotation charge at TW No- III of Morgram, Old Malda CCC in the dist of Malda Under Malda Mechanical Division PHE Dte BILL/03511/2023-2024 BP-2023-24-531 15/02/2024 0 W.B.S.E.D.C.LTD 5.07 0.00 0 0
10 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Formal work order for the work of Implementation of MORGRAM Piped Water Supply Scheme at Old Malda Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Amit Biswas, Assistant Engineer Bikash Balo, Junior Engineer ORD/000370/2023-2024 3107/MD 10/08/2023 630 NEOGI ENTERPRISE 664.04 374.77 56.44 70
11 MALDAH Maldah (Old) Malda Mechanical MORGRAM PWSS , SM/18557 New Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I,II & III and Making Compound Lighting arrangement and allied works at T/W No. I of Morgram Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/018419) Assistant Engineer - II Junior Engineer-07 ORD/000752/2023-2024 2818/MLMD 17/08/2023 527 MERCURY ENGINEERING COMPANY. 36.65 17.98 49.06 87
12 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Construction of Boundary Wall at head work site of Morgram Water Supply Scheme under Old Malda Block under Malda Division, PHE Dte. in the district of Malda. Mr. Amit Biswas, Assistant Engineer Bikash Balo, Junior Engineer ORD/000202/2024-2025 2989/MD 11/06/2024 416 NEOGI ENTERPRISE 25.32 0.00 0 67
13 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Design, Fabrication, Supplying, Installing, Commissioning and 3 (three) months Trial Run of 100 m³/hr. capacity of Iron Elimination Plant (Pressure Type) with provision of polishing unit and Construction of 3.60 mtr. X 3.00 mtr. Blower room of Head Work Site of MORGRAM Water Supply Scheme of Old Malda Dev. Block under Malda Division P.H.E Dte in the District of Malda. Mr. Debasis Pal, Assistant Engineer Bikash Balo, Junior Engineer ORD/000227/2025-2026 4232/MD 29/08/2025 60 NEOGI ENTERPRISE 34.98 0.00 0 0
14 MALDAH Maldah (Old) Malda Division MORGRAM PWSS , SM/18557 New Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for Official use of the office of the Assistant Engineer, Malda Sadar Sub-Division Division, PHE Dte. (Car-2) (Period from 01/09/2025 to 31/12/2025). Sri Arnab Giri, Assistant Engineer,Sri Biswadip Sengupta , Assistant Engineer Amit Karmakar, Junior Engineer ,Ziaur Rahaman, Junior Engineer ORD/000507/2025-2026 4153/MD 28/08/2025 122 SINGH BROTHERS 0.57 0.00 0 0
Total 978.65 393.05 40.16