Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 1,233.94 114.71 9.3  
1 MALDAH Malda Mechanical Augmentation of Samsi PWSS. , SM/18447 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I, II, III & IV of Samsi (Zone-I) Water Supply Scheme and making compound lighting arrangement at Head Work Site in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/008164) Assistant Engineer - II ORD/000502/2023-2024 2572/MLMD 04/08/2023 120 GHOSH BROTHERS... 44.09 0.00 0 0
2 MALDAH Malda Mechanical Augmentation of Samsi PWSS. , SM/18447 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II and making compound lighting arrangement at Head worksite of Samsi (zone-II) Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/008164) Assistant Engineer - II Junior Engineer-05 ORD/000501/2023-2024 2571/MLMD 04/08/2023 120 SUDIP DEY 24.47 0.00 0 0
3 MALDAH Malda Division Augmentation of Samsi PWSS. , SM/18447 Augmentation Material Requisition To Resource Division RTOR000196/2023-2024 818/MD 21/02/2024 Resource Division 98.17 0.00 0 0
4 MALDAH Malda Division Augmentation of Samsi PWSS. , SM/18447 Augmentation Continuation work order for the work of Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for Official use of the office of the Executive Engineer, Malda Division, PHE Dte. (Period from 01/11/2023 to 30/04/2024). Mr. Prosanta Mandal, Assistant Engineer Mr. Sujit Sarkar, Junior Engineer ORD/000716/2023-2024 4428/MD 30/10/2023 180 SHABNAM ARA 0.86 1.39 161.63 56
5 MALDAH Malda Division Augmentation of Samsi PWSS. , SM/18447 Augmentation Formal work order for the work of Augmentation of SAMSI (Zone-I & II) Piped Water Supply Scheme at Ratua-I Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Prasanta Mandal, Assistant Engineer,Mr. Prosanta Mandal, Assistant Engineer Rahul Das Biswas, Junior Engineer ORD/000356/2023-2024 3014/MD 08/08/2023 270 DUTTA ENTERPRISE 1,066.35 113.32 10.63 18
Total 1,233.94 114.70 9.3