Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 251.44 126.6 50.35  
1 MALDAH Malda Mechanical Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation W.B.S.E.D.C.LTD Quotation charge at P/H No. V of Bahirgachi , Pandua C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II Junior Engineer-07 ORD/000129/2023-2024 3004293382 16/05/2023 90 W.B.S.E.D.C.LTD 3.67 3.67 100 34
2 MALDAH Malda Mechanical Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation W.B.S.E.D.C.LTD Quotation charge at P/H No. IV of Bahirgachi , Pandua C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II Junior Engineer-07 ORD/000130/2023-2024 3004293388 16/05/2023 90 W.B.S.E.D.C.LTD 10.01 10.01 100 34
3 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Acceptance cum formal work order for Sinking of ( 250mm. Dia. x 200mm. Dia ) Big dia Tube Well No - 5 (160.00 Mtr. deep ) by D.R. Rig method using P.V.C. pipe & Gravel Filter including supply of Materials at BAHIRGACHHI Water Supply Scheme of Gazole Block under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000719/2022-2023 1177/MD 20/03/2023 30 M/S DYNAMIC CONSTRUCTION 10.03 8.05 80.26 100
4 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Acceptance cum formal work order for Sinking of ( 250mm. Dia. x 200mm. Dia ) Big dia Tube Well No - 4 (160.00 Mtr. deep ) by D.R. Rig method using P.V.C. pipe & Gravel Filter including supply of Materials at BAHIRGACHHI Water Supply Scheme of Gazole Block under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000718/2022-2023 1176/MD 20/03/2023 30 M/S DYNAMIC CONSTRUCTION 10.03 8.79 87.64 100
5 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage uPVC pipe line by different dia UPVC pipe for BAHIRGACHHI Piped Water Supply Scheme (Raikhadighi JL-23) at Gazole Dev. Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000697/2022-2023 1154/MD 20/03/2023 45 M/S KUNDU CONSTRUCTION 46.45 43.89 94.49 80
6 MALDAH Malda Mechanical Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Supply, installation, commissioning & Trial operation of electro-mechanical components at T/W no IV,V,VI & VII of Source Augmentation Bahirgachi Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/015614) Assistant Engineer - II Junior Engineer-07 ORD/002025/2023-2024 4764/MLMD 29/12/2023 180 PROGRESSIVE ENG'S CO-OP. SOCIETY LTD 45.26 0.00 0 0
7 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Acceptance cum formal work order for Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Bahirgachhi Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000729/2022-2023 1203/MD 21/03/2023 45 M/S. TEWARI CONSTRUCTION 8.33 4.15 49.82 100
8 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Design, Supplying, Fabrication, Erection & Commissioning including 3 (three) months Trial Run of 40m³/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room & backwash water disposal at Tubewell no. 4 site of Bahirgachi Water Supply Scheme of Gazole Block under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000999/2023-2024 1178/MD 14/03/2024 180 A. K. CONSTRUCTION 17.97 0.00 0 0
9 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Design, Supplying, Fabrication, Erection & Commissioning including 3 (three) months Trial Run of 40m³/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room & backwash water disposal at Tubewell no. 5 site of Bahirgachi Water Supply Scheme of Gazole Block under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/001000/2023-2024 1179/MD 14/03/2024 180 UTTAM KUMAR GHOSH 18.00 0.00 0 0
10 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Construction of Boundary Wall at 4th Tube Well site of Bahirgachi Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/001023/2023-2024 1249/MD 15/03/2024 30 A. L. ENGINEERING SOLUTION 9.45 0.00 0 0
11 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage uPVC pipe line by different dia UPVC pipe for BAHIRGACHHI Piped Water Supply Scheme (Raikhadighi JL-24) at Gazole Dev. Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000704/2022-2023 1162/MD 20/03/2023 45 UTTAM KUMAR GHOSH 54.79 48.04 87.68 100
12 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Laying of Pipeline work for facilitating FHTC at Bahirgachi Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000145/2024-2025 3223/MD 27/06/2024 30 M/S NARESH KUMAR JAIN 4.95 0.00 0 0
13 MALDAH Malda Division Source Augmentation of Bahirgachi Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15113 Augmentation Construction of Boundary Wall at 5th Tube Well site of Bahirgachi Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000998/2023-2024 1177/MD 14/03/2024 30 M/S MANDAL & SONS 12.50 0.00 0 100
Total 251.43 126.59 50.35