Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 36.66 11.48 31.31  
1 MALDAH Malda Division Source Augmentation of Sadlichak Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15112 Augmentation Acceptance cum formal work order for Sinking of 01(one) nos. 250mm. Dia. x 150mm. Big dia Tube Well 246 Mtr. deep by D.R. Rig method using UPVC pipe & Strainer in connection with Source Augmentation of SADLICHAK Piped Water Supply Scheme under Malda Division P.H.E Dte in the District of Malda. Mr. Amit Biswas, Assistant Engineer ORD/000720/2022-2023 1178/MD 20/03/2023 30 JAYA ENTERPRISE 12.03 0.00 0 0
2 MALDAH Malda Division Source Augmentation of Sadlichak Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15112 Augmentation Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Sadlichak Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Junior Engineer ORD/000754/2022-2023 1302/MD 23/03/2023 45 SOFIKUL ISLAM 4.19 0.00 0 0
3 MALDAH Malda Division Source Augmentation of Sadlichak Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15112 Augmentation Acceptance cum formal work order for Laying of additional UPVC Pipe line in connection with Source Augmentation of Sadlichak Piped Water Supply Scheme at Harishchandrapur II Block, under Malda Division, P.H.E. Dte. in the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000574/2022-2023 765/MD 17/02/2023 30 RABIUL ISLAM 6.89 6.87 99.71 0
4 MALDAH Malda Mechanical Source Augmentation of Sadlichak Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15112 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. III of Sadlichak Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/016501) Assistant Engineer - II Junior Engineer-05 ORD/000581/2023-2024 2630/MLMD 10/08/2023 180 FUTURE 11.43 4.61 40.33 80
5 MALDAH Malda Division Source Augmentation of Sadlichak Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15112 Augmentation Interconnection between New Tube Well and Existing UPVC/DI/HDPE pipe line in connection with Source Augmentation of Sadlichalk Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000196/2024-2025 2900/MD 07/06/2024 30 SAYEM ENTERPRISE 2.12 0.00 0 0
Total 36.66 11.48 31.32