Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 188.73 117.34 62.17  
1 MALDAH Malda Division Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15105 Augmentation Acceptance cum formal work order for Laying of additional pipeline & replacing damaged AC pipe line by UPVC Pipe line in connection with Source Augmentation of DAHARA Piped Water Supply Scheme under Malda Division, P.H.E. Dte. in the District of Malda .(Part-II) Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000565/2022-2023 756/MD 17/02/2023 45 SUBHAS CHANDRA KESHARI 85.86 85.79 99.92 0
2 MALDAH Malda Division Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15105 Augmentation Acceptance cum formal work order for Sinking of 01(one) nos. 250mm. Dia. x 200mm. Big dia Tube Well 150 Mtr. deep by D.R. Rig method using UPVC pipe & Strainer in connection with Source Augmentation of DAHARA Piped Water Supply Scheme under Malda Division P.H.E Dte in the District of Malda. (2nd Call) Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Sanjit Sarkar, Junior Engineer ORD/000782/2022-2023 1440/MD 29/03/2023 30 ASHIS CONSTRUCTION 11.02 5.43 49.27 100
3 MALDAH Malda Mechanical Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15105 Augmentation Quatation for new service connection at DAHARAw/s sch. T/W no III UNDER MLMD. Dist Malda. (Harishchandrapur C. C. C) BILL/03508/2023-2024 BP-2023-24-528 15/02/2024 W.B.S.E.D.C.LTD 8.41 0.00 0 null
4 MALDAH Malda Mechanical Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15105 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. III of Dahara Water Supply Scheme in the District of Malda under Mechanical Division, PHE Dte. (TSM/016549) Assistant Engineer - II Junior Engineer-05 ORD/001811/2023-2024 3698/MLMD 29/11/2023 180 DAS CONSTRUCTION 12.55 11.19 89.16 88
5 MALDAH Malda Division Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15105 Augmentation Design, Supplying, Fabrication, Erection & Commissioning including 3 (three) months Trial Run of 50m³/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room & backwash water disposal at head work site of Dahara Water Supply Scheme of Harishchandrapur-II Block under Malda Division P.H.E Dte in the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Sanjit Sarkar, Junior Engineer ORD/000257/2024-2025 3205/MD 27/06/2024 180 WATER TECH 20.04 0.00 0 0
6 MALDAH Malda Division Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15105 Augmentation Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dahara Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Sanjit Sarkar, Junior Engineer ,Mr. Tilok Roy, Junior Engineer ORD/000750/2022-2023 1298/MD 23/03/2023 45 A. L. ENGINEERING SOLUTION 4.19 4.18 99.76 97
7 MALDAH Malda Division Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15105 Augmentation Acceptance cum formal work order for Laying of additional pipeline & replacing damaged AC pipe line by UPVC Pipe line in connection with Source Augmentation of DAHARA Piped Water Supply Scheme under Malda Division, P.H.E. Dte. in the District of Malda .(Part-I) Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Sanjit Sarkar, Junior Engineer ,Mr. Tilok Roy, Junior Engineer ORD/000557/2022-2023 748/MD 17/02/2023 30 M/S AMIT KUMAR GUPTA 46.66 10.75 23.04 95
Total 188.74 117.34 62.17