Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 47.16 35.78 75.87  
1 MALDAH Malda Division Source Augmentation of Rampur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15062 Augmentation Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Rampur Piped Water Supply Scheme at Chanchal-II Block of Malda District under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Junior Engineer ORD/000753/2022-2023 1301/MD 23/03/2023 45 SUBINDU PRAMANIK 4.19 0.00 0 0
2 MALDAH Malda Division Source Augmentation of Rampur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15062 Augmentation Acceptance cum formal work order for Laying of additional UPVC Pipe line in connection with Source Augmentation of Rampur Piped Water Supply Scheme, Chanchal II Block under Malda Division, P.H.E. Dte. in the District of Malda Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000573/2022-2023 764/MD 17/02/2023 30 PACIFIC ENGINEER'S CO-OPERATIVE SOCIETY LTD. 18.18 18.15 99.83 100
3 MALDAH Malda Division Source Augmentation of Rampur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15062 Augmentation Acceptance cum formal work order for Sinking of ( 200mm. Dia. x 150mm. Dia ) Big dia Tube Well ( 250.00 Mtr. deep ) by D.R. Rig method using P.V.C. pipe including supply of Materials at Rampur Water Supply Scheme under Malda Division P.H.E Dte in the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Junior Engineer ORD/000769/2022-2023 1397/MD 28/03/2023 30 A. L. ENGINEERING SOLUTION 13.37 12.62 94.39 100
4 MALDAH Malda Mechanical Source Augmentation of Rampur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15062 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. III of Rampur Water Supply Scheme in the District of Malda under Mechanical Division, PHE Dte. (TSM/016552) Assistant Engineer - II Junior Engineer-05 ORD/000577/2023-2024 2626/MLMD 10/08/2023 180 JIBON GHOSH. 11.42 5.01 43.87 88
Total 47.15 35.79 75.89