Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 397.04 140.66 35.43  
1 MALDAH Gazole Malda Mechanical Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New W.B.S.E.D.C.LTD Quotation charge at T/W No. I of Uttar Mahinagar PWSS , Gazol C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II Junior Engineer-07 ORD/001891/2023-2024 3004467221 17/10/2023 90 W.B.S.E.D.C.LTD 4.05 4.05 100 100
2 MALDAH Gazole Malda Mechanical Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New W.B.S.E.D.C.LTD Quotation charge at T/W No. II of Uttar Mahinagar PWSS , Gazol C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II Junior Engineer-07 ORD/001892/2023-2024 3004467207 17/10/2023 90 W.B.S.E.D.C.LTD 4.00 4.00 100 100
3 MALDAH Gazole Malda Division Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Material Requisition To Resource Division RTOR000045/2023-2024 1811/MD 27/04/2023 0 Resource Division 21.65 0.00 0 0
4 MALDAH Gazole Malda Division Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Material Requisition To Resource Division RTOR000164/2023-2024 241/MD 10/01/2024 0 Resource Division 4.53 0.00 0 0
5 MALDAH Gazole Malda Division Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Formal work order for Implementation of Uttar Mahinagar Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000740/2022-2023 1252/MD 22/03/2023 1069 M/S DAS CONSTRUCTION 239.41 132.61 55.39 70
6 MALDAH Gazole Malda Division Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Construction of Boundary Wall at Head Work site of Uttar Mahinagar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000268/2024-2025 3226/MD 28/06/2024 552 M/S DAS CONSTRUCTION 36.14 0.00 0 40
7 MALDAH Gazole Malda Mechanical Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II and Making Compound Lighting arrangement and allied works at T/W No. I of Uttar Mahinagar Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. Assistant Engineer - II Junior Engineer-05,Junior Engineer-06,Junior Engineer-07 ORD/000315/2024-2025 2943/MLMD 11/09/2024 322 M/S SAJAHAN CHOWDHURY 25.30 0.00 0 80
8 MALDAH Gazole Malda Division Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Providing Functional Household Tap Connection (FHTC) and Laying of Distribution Pipeline in connection with Jal Jeevan Mission (JJM) at Uttar Mahinagar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000263/2024-2025 3211/MD 27/06/2024 551 M/S DAS CONSTRUCTION 33.31 0.00 0 20
9 MALDAH Gazole Malda Division Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Road cutting and road restoration at Uttar Mahinagar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000690/2024-2025 6207/MD 09/12/2024 388 M/S DAS CONSTRUCTION 5.06 0.00 0 0
10 MALDAH Gazole Malda Division Uttar Mahinagar Piped Water Supply Scheme , SM/12765 New Providing Balance Functional Household Tap Connection (FHTC) and Laying of Distribution Pipeline in connection with Jal Jeevan Mission (JJM) at Uttar Mahinagar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000175/2025-2026 2891/MD 17/06/2025 60 M/S AMIT KUMAR GUPTA 23.59 0.00 0 0
Total 397.04 140.66 35.43