Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 217.9 166.2 76.27  
1 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Acceptance cum formal work order for Sinking of (250mm. Dia. x 200 mm. dia.) Big dia. Tube Well (120 Mtr. Deep) by D.R. Rig method using P.V.C. pipe and Gravel Filter including supply of Materials at MEKPUR Piped Water Supply Scheme (Tube Well No-4) of Old Malda Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ramen Karmakar, Junior Engineer ORD/000377/2022-2023 2703/MD 17/11/2022 30 A. L. ENGINEERING SOLUTION 8.42 8.42 100 1
2 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage A.C /upvc pipe line by different dia UPVC pipe for MEKPUR Piped Water Supply Scheme (JL-11 Tutkhan, JL-12 Goalpara, and JL-14 Gotpara) at Old Malda Dev. Block in the District of Malda under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ramen Karmakar, Junior Engineer ORD/000412/2022-2023 2986/MD 07/12/2022 45 M/S PARIMAL DAS 56.72 53.93 95.08 1
3 MALDAH Malda Mechanical Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. III of Mekpur PWSS, Old Malda C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000049/2023-2024 3004243230 27/04/2023 90 W.B.S.E.D.C.LTD 4.50 4.50 100 0
4 MALDAH Malda Mechanical Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. IV of Mekpur PWSS, Old Malda C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000050/2023-2024 3004243234 27/04/2023 90 W.B.S.E.D.C.LTD 2.42 2.42 100 0
5 MALDAH Malda Mechanical Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. III, IV & V of Source Augmentation of Mekpur Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/014459) Assistant Engineer - II ORD/001126/2022-2023 509/MLMD 20/03/2023 120 ORIENTAL ENGINEERING CO. 34.55 20.21 58.49 58
6 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Acceptance cum formal work order for Sinking of (250mm. Dia. x 200 mm. dia.) Big dia. Tube Well (120 Mtr. Deep) by D.R. Rig method using P.V.C. pipe and Gravel Filter including supply of Materials at MEKPUR Piped Water Supply Scheme (Tube Well No-3) of Old Malda Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ramen Karmakar, Junior Engineer ORD/000376/2022-2023 2702/MD 17/11/2022 30 A. L. ENGINEERING SOLUTION 8.42 8.42 100 1
7 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Acceptance cum formal work order for Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Mekpur Piped Water Supply Scheme at Old Malda Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000054/2023-2024 1985/MD 17/05/2023 45 HIRAK ROY CHOUDHURY 8.28 8.27 99.88 100
8 MALDAH Malda Mechanical Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. III of Mekpur, Old malda C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. BILL/02569/2023-2024 BP-2023-24-462 17/01/2024 W.B.S.E.D.C.LTD 1.01 0.00 0 0
9 MALDAH Malda Mechanical Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. III of Mekpur, Old malda C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. BILL/02569/2023-2024 BP-2023-24-462 17/01/2024 W.B.S.E.D.C.LTD 1.01 0.00 0 0
10 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage A.C /upvc pipe line by different dia UPVC pipe for MEKPUR Piped Water Supply Scheme (JL-15 Samsabad, JL-20 Kadamtali, JL-21 Badanpur, JL-22 Chhotapara, JL-23 Lakshmi Kandar and JL-27 Rahutgaon) at Old Malda Dev. Block in the District of Malda under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000411/2022-2023 2985/MD 07/12/2022 45 MANIK CHOUDHURY 55.22 52.71 95.45 100
11 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Construction of Boundary Wall at Goalpara Mouza under Mekpur Water Supply Scheme under Old Malda Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/001012/2023-2024 1514/MD 16/03/2024 30 S. N. CONSTRUCTION 11.32 4.50 39.75 0
12 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Construction of Boundary Wall at Kadamtali Mouza under Mekpur Water Supply Scheme under Old Malda Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000252/2024-2025 3188/MD 27/06/2024 30 MANIK CHOUDHURY 19.96 0.00 0 0
13 MALDAH Malda Division Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12763 Augmentation Extension of pipe line and replacing of damage A.C./uPVC pipe line by different dia. UPVC pipe for MEKPUR Piped Water Supply Scheme at Old Malda Block under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000973/2023-2024 870/MD 27/02/2024 45 S. R. ENTERPRISE 6.07 2.82 46.46 100
Total 217.90 166.20 76.28