Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 111.47 55.24 49.56  
1 MALDAH Malda Division Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage A.C /upvc pipe line by different dia UPVC pipe for BHABUK Piped Water Supply Scheme at Habibpur Dev. Block in the District of Malda under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Mukaddar Parvage, Junior Engineer ORD/000410/2022-2023 2984/MD 07/12/2022 45 SOVON KUMAR DAS 43.65 40.92 93.75 1
2 MALDAH Malda Division Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Bhabuk Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Mukaddar Parvage, Junior Engineer ORD/000727/2022-2023 1201/MD 21/03/2023 45 M.S. ENTERPRISE 4.17 2.06 49.4 0
3 MALDAH Malda Division Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation Acceptance cum formal work order for Sinking of (250mm. Dia. x 200 mm. dia.) Big dia. Tube Well (135 Mtr. Deep) by D.R. Rig method using P.V.C. pipe and Gravel Filter including supply of Materials at BHABUK Piped Water Supply Scheme (Tube Well No-3) of Habibpur Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Mukaddar Parvage, Junior Engineer ORD/000379/2022-2023 2705/MD 17/11/2022 30 A. L. ENGINEERING SOLUTION 9.14 6.40 70.02 100
4 MALDAH Malda Division Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation Acceptance cum formal work order for Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for Official use of the office of the Executive Engineer, Malda Division, PHE Dte. (Period from 01/11/2022 to 30/04/2023). Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000518/2022-2023 2474/MD 21/10/2022 365 SHABNAM ARA 4.50 0.20 4.44 21
5 MALDAH Malda Mechanical Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. III of Bhabuk, Aiho C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. BILL/02484/2023-2024 BP-2023-24-420 04/01/2024 W.B.S.E.D.C.LTD 6.71 0.00 0 0
6 MALDAH Malda Division Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation Emergent Laying of different diameter UPVC Pipeline and others allied work for Gap negotiatiomn for BHABUK its adjoining mouzas Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000966/2023-2024 805/MD 21/02/2024 45 GOBINDA ENTERPRISE 12.33 0.00 0 0
7 MALDAH Malda Division Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of SOURCE AUGMENTATION of BHABUK Water Supply Scheme at Habibpur Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/001017/2023-2024 1519/MD 16/03/2024 45 M/S JHA CONSTRUCTION 20.45 0.00 0 0
8 MALDAH Malda Mechanical Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda , SM/12762 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. III of Bhabuk Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/014864) Assistant Engineer - II Junior Engineer-03 ORD/000309/2023-2024 2311/MLMD 26/07/2023 120 SUBRATA KUMAR DAS. 10.52 5.66 53.8 30
Total 111.46 55.24 49.56