Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 305.3 96.98 31.77  
1 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Material Requisition To Resource Division RTOR000036/2022-2023 3048/MD 12/12/2022 Resource Division 17.95 0.00 0 0
2 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Acceptance cum formal work order for Sinking of 250mm. Dia. x 150 mm. dia. and 150 Mtr. Deep Big dia Tube well (1 No) at SAHARANPUR Water Supply Scheme under Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000607/2022-2023 925/MD 27/02/2023 30 DUTTA ENTERPRISE 10.13 0.00 0 0
3 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Material Requisition To Resource Division RTOR000001/2023-2024 1581 10/04/2023 Resource Division 6.65 0.00 0 0
4 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Material Requisition To Resource Division RTOR000015/2023-2024 1617/MD 11/04/2023 Resource Division 6.65 0.00 0 0
5 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Acceptance cum formal work order for Sinking of 250mm. Dia. x 150 mm. Big dia. and 135 Mtr. deep Tube Well Drilling by Direct Rotary method with 150 mm dia upvc strainer of 30m length all complete including cost of materials at Heads Work Site of SHARANPUR Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000368/2022-2023 2697/MD 17/11/2022 30 ASHIS CONSTRUCTION 9.20 8.85 96.2 0
6 MALDAH Harischandrapur - II Malda Mechanical Sharanpur Piped Water Supply Scheme , SM/12631 New W.B.S.E.D.C.LTD Quotation charge at T/W No. I of Sharanpur PWSS, Kushida C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000302/2023-2024 3004302713 21/07/2023 90 W.B.S.E.D.C.LTD 7.50 7.50 100 100
7 MALDAH Harischandrapur - II Malda Mechanical Sharanpur Piped Water Supply Scheme , SM/12631 New W.B.S.E.D.C.LTD Quotation charge at T/W No. II of Sharanpur, Kushida C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000421/2023-2024 3004368694 28/07/2023 90 W.B.S.E.D.C.LTD 3.49 3.49 100 100
8 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Formal work order for the work of Implementation of SHARANPUR Water Supply Scheme at Harishchandrapur-II Block of Malda district under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000587/2022-2023 825/MD 21/02/2023 365 M/S DAS CONSTRUCTION 189.29 66.19 34.97 45
9 MALDAH Harischandrapur - II Malda Mechanical Sharanpur Piped Water Supply Scheme , SM/12631 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I ,II and making compound lighting arrangement at T/W no. I of Sharanpur Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/013210) Assistant Engineer - II Junior Engineer-05 ORD/000736/2023-2024 2798/MLMD 17/08/2023 180 SHREE BISHNU CONSTRUCTION 22.93 10.95 47.75 85
10 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Construction of Boundary Wall at 2nd Tube Well site of Sharanpur Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Sanjit Sarkar, Junior Engineer ORD/000184/2024-2025 2959/MD 10/06/2024 30 M/S DAS CONSTRUCTION 9.32 0.00 0 0
11 MALDAH Harischandrapur - II Malda Division Sharanpur Piped Water Supply Scheme , SM/12631 New Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Sharanpur Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation,Mr. Tilok Roy, Junior Engineer ORD/000297/2024-2025 3443/MD 11/07/2024 45 M/S DAS CONSTRUCTION 22.19 0.00 0 0
Total 305.32 96.98 31.76