Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 102.35 71.33 69.69  
1 MALDAH Malda Division Source Augmentation of Sankail Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12323 Augmentation Acceptance cum formal work order for Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of SANKAIL Water Supply Scheme of Habibpur Block. under Malda Division, PHE Dte. in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ramen Karmakar, Junior Engineer,Sumit Kumar Ganguly, Junior Engineer ORD/000343/2022-2023 2800/MD 24/11/2022 45 M/S N. N. ENTERPRISE 6.68 0.00 0 0
2 MALDAH Malda Division Source Augmentation of Sankail Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12323 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage A.C /upvc pipe line by different dia UPVC pipe for SANKAIL Piped Water Supply Scheme of Habibpur Block in the District of Malda under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ramen Karmakar, Junior Engineer,Sumit Kumar Ganguly, Junior Engineer ORD/000365/2022-2023 2606/MD 10/11/2022 45 M/S KUNDU CONSTRUCTION 71.98 66.44 92.3 0
3 MALDAH Central Drilling Source Augmentation of Sankail Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12323 Augmentation Resistivity survey for Sankail PWSS, Basara PWSS and Pannapur PWSS at Habibipur & Bamongola block under Malda district, CMSD-II (D), CDD, PHE Dte. ORD/000012/2023-2024 135/CMSD-II(D) 24/05/2023 15 S B S ENTERPRISE 0.82 0.00 0 100
4 MALDAH Malda Mechanical Source Augmentation of Sankail Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12323 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. III of Sankail Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/014344) Assistant Engineer - II Junior Engineer-03 ORD/000387/2023-2024 2395/MLMD 28/07/2023 120 SUDIP DEY 11.10 0.00 0 0
5 MALDAH Malda Division Source Augmentation of Sankail Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12323 Augmentation Sinking of ( 250 mm Dia. X 200 mm Dia.) Tubewell No.-3 (130 M deep) by D.R Rig. Method using P.V.C. pipe & Gravel Filter including Supply of materials at SANKAIL Water Supply Scheme of Habibpur Block under Malda Division, P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000920/2023-2024 381/MD 17/01/2024 45 A. L. ENGINEERING SOLUTION 11.77 4.89 41.55 100
Total 102.36 71.32 69.68