Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 162.87 56.12 34.46  
1 MALDAH Malda Mechanical Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. I of Kutubsahar PWSS, Pandua C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000860/2023-2024 3004402679 29/08/2023 90 W.B.S.E.D.C.LTD 3.54 3.54 100 100
2 MALDAH Malda Mechanical Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. V of Kutub Sahar , Pandua C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II Junior Engineer-07 ORD/001890/2023-2024 3004496749 28/11/2023 90 W.B.S.E.D.C.LTD 5.28 2.64 50 100
3 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Material Requisition To Resource Division RTOR000022/2022-2023 2409/MD 17/10/2022 Resource Division 5.56 0.00 0 0
4 MALDAH Malda Mechanical Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. IV & V of Source Augmentation Kutub Sahar Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/014339) Assistant Engineer - II Junior Engineer-07 ORD/000506/2023-2024 2577/MLMD 04/08/2023 120 MAA BHABOTARINE ENTERPRISE. 23.05 9.39 40.74 64
5 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage A.C pipe line (damage due to widening of road) by different dia UPVC pipe for KUTUB SAHAR Piped Water Supply Scheme of Gazole Block in the District of Malda under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000361/2022-2023 2604/MD 10/11/2022 45 BEE GEE CONSTRUCTION 55.12 20.86 37.84 65
6 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Acceptance cum formal work order for Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of KUTUB SAHAR Water Supply Scheme of Gazole Block .under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000348/2022-2023 2802/MD 24/11/2022 45 MARSS INTERNATIONAL 6.69 5.31 79.37 100
7 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Design, Supplying, Fabrication, Erection & Commissioning including 3 (three) months Trial Run of 35m³/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room & backwash water disposal at Tubewell no. 4 site of Kutubshar Water Supply Scheme of Gazole Block under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/001005/2023-2024 1183/MD 14/03/2024 180 M/S JHA CONSTRUCTION 17.28 0.00 0 0
8 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Construction of Boundary Wall of Tubewell site at Khord Babupur Mouza of Kutub Sahar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/001006/2023-2024 1193/MD 14/03/2024 30 AHONA ENTERPRISE 10.71 0.00 0 0
9 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Construction of Boundary Wall of Tubewell site at Misipur Mouza of Kutubsahar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/001024/2023-2024 1250/MD 15/03/2024 30 SATELLITE CONSTRUCTION 9.60 0.00 0 0
10 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Tube Well No.-5 site in connection with Source Augmentation of KUTUB SAHAR Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000366/2023-2024 3055/MD 09/08/2023 45 A. L. ENGINEERING SOLUTION 4.15 0.00 0 100
11 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Sinking of (250mm. Dia. x 200 mm. dia.) Big dia. Tube Well No. - 5 (160 Mtr. Deep) by D.R. Rig method using P.V.C. pipe and Gravel Filter including supply of Materials at KUTUB SAHAR Water Supply Scheme of Gazole Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000445/2023-2024 3352/MD 29/08/2023 30 A. L. ENGINEERING SOLUTION 11.88 5.81 48.91 100
12 MALDAH Malda Division Source Augmentation of Kutub Sahar Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/12317 Augmentation Acceptance cum formal work order for Sinking of (250mm. Dia. x 200mm. Dia ) Tube Well no-4 & 5 ( 160 Mtr. deep ) by D.R. Rig method using P.V.C. pipe & Gravel Filter including supply of Materials at KUTUB SAHAR Water Supply Scheme of Gazole Block. under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000338/2022-2023 2510/MD 03/11/2022 30 A. D. D. ASSOCIATES 10.01 8.57 85.61 100
Total 162.88 56.14 34.47