Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
24 783.92 363.55 46.38  
1 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Acceptance cum formal work order for Route survey for distribution network design for augmentation of Mirzapur Water Supply Scheme in Bamongola block under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000146/2021-2022 1744/MD 15/06/2021 14 HORIZEN 2.86 2.28 79.72 1
2 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Acceptance cum formal work order for Design, Preparation & Submission of DPR as per existing route survey data for Augmentation of Mirzapur Piped Water Supply Scheme under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000534/2021-2022 2687/MD 09/09/2021 7 HORIZEN 1.25 1.25 100 1
3 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Supply, delivery, installation and commissioning of electro-mechanical components of Augmentation of MIRZAPUR Water Supply Scheme T/W no. I in the District of Malda under Malda Mechanical Division, PHE Dte. Assistant Engineer - II ORD/000963/2022-2023 2949/MLMD 28/12/2022 60 DEY ENTERPRISE.. 11.13 9.86 88.59 1
4 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Supply, delivery, installation and commissioning of electro-mechanical components of Augmentation of MIRZAPUR Water Supply Scheme T/W no. II in the District of Malda under Malda Mechanical Division, PHE Dte. Assistant Engineer - II ORD/000964/2022-2023 2950/MLMD 28/12/2022 60 MERCURY ENGINEERING COMPANY. 11.06 9.79 88.52 1
5 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of augmentation of MIRZAPUR Water Supply Scheme T/W no. IV in the District of Malda under Malda Mechanical Division, PHE Dte. Assistant Engineer - II ORD/000966/2022-2023 2952/MLMD 28/12/2022 90 DILIP MAHATO. 11.25 8.89 79.02 1
6 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of augmentation of MIRZAPUR Water Supply Scheme T/W no. III in the District of Malda under Malda Mechanical Division, PHE Dte. Assistant Engineer - II ORD/000965/2022-2023 2951/MLMD 28/12/2022 90 M/S D.G.B. ENTERPRISE. 11.25 8.37 74.4 1
7 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Placement of fund against the work for Road restoration work for laying of pipe line for Bamongala Habibpur Road (Portion from 7.00 kmp to 7.50 kmp) for Mirzapur Piped Water Supply Scheme under Malda Division, PHE Dte. BILL/00530/2022-2023 BP-2022-23-211 16/03/2023 EXECUTIVE ENGINEER, MALDA HIGHWAY DIVISION, P.W. (ROADS) DIRECTORATE. 3.11 0.00 0 0
8 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation W.B.S.E.D.C.LTD Quotation charge at P/H No. III of Mirzapur, Bamongola C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000104/2023-2024 3004228429 26/04/2023 90 W.B.S.E.D.C.LTD 6.85 6.85 100 0
9 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation W.B.S.E.D.C.LTD Quotation charge at P/H No. IV of Mirzapur, Bamongola C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000103/2023-2024 3004228411 26/04/2023 90 W.B.S.E.D.C.LTD 4.57 4.57 100 0
10 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to tubewell No 3 at Mirzapur PWSS of Bamongola Block under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000461/2023-2024 3394/MD 31/08/2023 45 DIPU DUTTA 4.16 0.00 0 0
11 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Material Requisition To Resource Division RTOR000014/2022-2023 1873/MD 16/08/2022 Resource Division 132.02 0.00 0 0
12 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Claim for purchase of fuel for hiring of inspection for different site visit use for Assistant Engineer-II ,Under Mechanical Division, P.H.E. Dte. Assistant Engineer - II Junior Engineer-04 ORD/001362/2022-2023 270/MLMD. 24/02/2023 59 SUBRATA SAHA 0.44 0.44 100 100
13 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Continuation work- Hiring of Inspection vehicle (Diesel driven) for official use of Assistant Engineer-II for the office of the Executive Engineer, Malda Mechanical Division, P.H.E. Dte. Assistant Engineer - II Junior Engineer-04 ORD/001147/2022-2023 270/MLMD 24/02/2023 60 SUBRATA SAHA 0.29 0.29 100 100
14 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Continuation work- Hiring of Inspection vehicle (Diesel driven) for official use of Assistant Engineer-II for the office of the Executive Engineer, Malda Mechanical Division, P.H.E. Dte. Assistant Engineer - II Junior Engineer-04 ORD/000086/2023-2024 699/MLMD 10/04/2023 60 SUBRATA SAHA 0.29 0.29 100 100
15 MALDAH Malda Mechanical Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Claim for purchase of fuel for hiring of inspection for different site visit use for Assistant Engineer-II ,Under Mechanical Division, P.H.E. Dte. Junior Engineer-06 ORD/000726/2023-2024 699/MLMD. 10/04/2023 7 SUBRATA SAHA 0.46 0.37 80.43 100
16 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Acceptance cum formal work order for Sinking of 300mm. Dia. x 200 mm. dia. and 140 Mtr. Deep Big dia Tube well (1 No) at Mirzapur Water Supply Scheme under Bamangola Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000017/2023-2024 1674/MD 18/04/2023 30 A. L. ENGINEERING SOLUTION 12.77 6.07 47.53 100
17 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Formal work order for the work of Laying Distribution pipe line for MIRZAPUR & its adjoining mouzas piped water supply at Bamongola Block in the District Malda under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000130/2022-2023 1747/MD 27/07/2022 60 UTTAM KUMAR DUTTA 163.77 160.79 98.18 100
18 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to tubewell No 4 at Mirzapur PWSS of Bamongola Block under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000462/2023-2024 3395/MD 31/08/2023 45 SARANGA SARKAR 4.17 2.06 49.4 100
19 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) and Laying of 90 mm dia (OD) uPVC Pipeline under command area of MIRZAPUR Water Supply Scheme at Bamangola Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Amit Biswas, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000224/2024-2025 3026/MD 13/06/2024 45 M/S KUNDU CONSTRUCTION 89.01 0.00 0 0
20 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Formal work order for the work of Construction of 600 M3 Capacity OHR with FHTC (Mouza- Jaitan, Mirzapur, Mukuli and Salalpur) of Mirzapur Piped Water Supply Scheme at Bamangola Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000312/2023-2024 2917/MD 31/07/2023 180 MATIUR RAHAMAN 281.67 135.12 47.97 80
21 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Additional Laying of different dia uPVC pipeline of Augmentation of MIRZAPUR Water Supply Scheme at Bamangola Dev. Block under Malda Division, P.H.E.Dte. In the district of Malda. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/001031/2023-2024 1257/MD 15/03/2024 15 UTTAM KUMAR DUTTA 1.88 0.00 0 100
22 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Dismentling of Concrete road and Construction the same at different places of road connecting to LDS of Augmentation of MIRZAPUR Water Supply Scheme at Bamangola Dev. Block under Malda Division, P.H.E.Dte. In the district of Malda. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000152/2024-2025 2921/MD 10/06/2024 30 UTTAM KUMAR DUTTA 12.53 6.26 49.96 100
23 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Construction of Boundary Wall at 3rd Tubewell Site of Mirzapur Water Supply Scheme under Bamongola Block under Malda Division, PHE Dte. in the district of Malda. Mr. Amit Biswas, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000308/2024-2025 3948/MD 07/08/2024 45 GIRIDHARI CONSTRUCTION 9.68 0.00 0 0
24 MALDAH Malda Division Augmentation of Mirzapur Piped Water Supply Scheme , SM/10317 Augmentation Construction of Boundary Wall at 4th Tubewell Site of Mirzapur Water Supply Scheme under Bamongola Block under Malda Division, PHE Dte. in the district of Malda. Mr. Amit Biswas, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/000309/2024-2025 3949/MD 07/08/2024 45 HIRAK ROY CHOUDHURY 7.45 0.00 0 0
Total 783.92 363.54 46.37