Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
32 1,427.16 751.87 52.68  
1 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Modification & upgradation of electro-mechanical installation work at Pump House no.- I, Zone- I of Araidanga water supply scheme in the district of Malda under Malda Mechanical; Division, PHE Dte. Assistant Engineer - II ORD/001125/2021-2022 306 /MLMD 22/02/2022 30 M/S MANABESH ROY 7.87 7.00 88.95 1
2 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Modification & upgradation of electro-mechanical installation work at Pump House no.- I, Zone- II of Araidanga water supply scheme in the district of Malda under Malda Mechanical; Division, PHE Dte. Assistant Engineer - II ORD/001127/2021-2022 308 /MLMD. 22/02/2022 30 DEVI ENTERPRISE... 8.26 7.76 93.95 1
3 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Modification & upgradation of electro-mechanical installation work at Pump House no.- II, Zone- I of Araidanga water supply scheme in the district of Malda under Malda Mechanical; Division, PHE Dte. Assistant Engineer - II ORD/001126/2021-2022 307 /MLMD 22/02/2022 30 ANIMA ENTERPRISE 7.91 7.41 93.68 1
4 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Supply and delivery of Calcium hypochlorite tablets at Araidanga & adjacent water supply schemes in the district of Malda under Malda Mechanical Division, P.H.E. Dte. Assistant Engineer - II ORD/000891/2021-2022 1667/MLMD 22/09/2021 12 DEY ENTERPRISE.. 0.89 0.89 100 1
5 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Hiring of Inspection vehicle (Diesel driven) for official use of AE-II for the office of the Executive Engineer, Malda Mechanical Division, P.H.E. Dte. Assistant Engineer - II ORD/000781/2021-2022 1490/MLMD 24/08/2021 6 SUBRATA SAHA 0.86 0.00 0 1
6 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Acceptance cum formal work order for Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 4th Tube Well site of Araidanga Zone-I Water Supply Scheme under Malda Division, PHE Dte. In the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000027/2022-2023 1306/MD 01/06/2022 30 J. M. CONSTRUCTION 4.76 0.00 0 0
7 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Acceptance cum formal work order for Sinking of 01 (One) No. 250mm. Dia. x 150mm. Big dia. Tube Well 120 Mtr. deep by Direct Rotary method using UPVC pipe & Strainer in connection with Augmentation of Araidanga (Zone-I)Piped Water Supply Scheme under Malda Division, P.H.E. Dte. in the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000047/2022-2023 1396/MD 14/06/2022 21 SNEHASISH GHOSH 6.91 0.00 0 0
8 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Claim for purchase of fuel for hiring of inspection vehicle (diesel driven for official) Use month of November, 2021 to September,2022, of issuance of Fuel & Lubricant to Vehicles bearing nos i) W.B-65-C 8851 ii) W.B-65-C 4392, iii) W.B-65-D 5401 for the office of the Executive Engineer,Malda Mechanical Division, P.H.E. Dte. Assistant Engineer - II ORD/001419/2021-2022 1808/MLMD 26/10/2021 30 SHAKTI FILLING STATION 0.62 0.00 0 1
9 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Placement of fund against the work for road restoration work for laying of pipe line for Aridanga Piped Water Supply Scheme under Malda Division, PHE Dte. VCH/001010/2022-2023 BP-2022-23-98 23/11/2022 EXECUTIVE ENGINEER, PUBLIC WORKS (ROADS) DIRECTORATE. 4.67 0.00 0 0
10 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Soil Investigation and design of substructure for Over Head Reservoirs for ARIDANGA ZONE-II Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. In the district of Malda. BILL/00490/2022-2023 BP-2022-23-199 09/03/2023 INDIAN INSTITUTE OF ENGINEERING SCIENCE AND TECHNOLOGY SHIBPUR. 2.95 0.00 0 0
11 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Soil Investigation and design of substructure for Over Head Reservoirs for ARIDANGA ZONE-I Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. In the district of Malda. BILL/00488/2022-2023 BP-2022-23-197 09/03/2023 INDIAN INSTITUTE OF ENGINEERING SCIENCE AND TECHNOLOGY SHIBPUR. 2.95 0.00 0 0
12 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Material Requisition To Resource Division RTOR000027/2023-2024 1606/MD 11/04/2023 Resource Division 31.54 0.00 0 0
13 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Material Requisition To Resource Division RTOR000046/2023-2024 1811/MD 27/04/2023 Resource Division 124.23 0.00 0 0
14 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Formal work order for the work of Laying of Distribution pipe line in connection with Augmentation of ARAIDANGA (Zone-II) Pipe Water Supply Scheme at Ratua-II Block in the District of Malda under Malda Division P.H.E. Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000133/2022-2023 1789/MD 01/08/2022 60 SUBHAS CHANDRA KESHARI 163.59 137.51 84.06 1
15 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Acceptance cum formal work order for Laying of Distribution pipe line in connection with Augmentation of Araidanga Zone-I ( node from J-69 to J-172, J-73 to 240, J-81 to 331, J-172 to J-73, 240 to J-191, 331 to J-69) Pipe Water Supply Scheme at Ratua-II Block in the District of Malda under Malda Division P.H.E. Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000144/2022-2023 1932/MD 23/08/2022 15 SUBRATA SAHA 6.17 6.17 100 1
16 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Acceptance cum formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of Augmentation of ARIDANGA ZONE-I Piped Water Supply Scheme at Ratua-II Block under Malda Division, PHE Dte. In the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000793/2022-2023 1477/MD 30/03/2023 30 CHARU CONSTRUCTION 11.09 10.18 91.79 0
17 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Supply, delivery, installation, commissioning and trial operation of electro-mechanical components of Augmentation of Araidanga Water Supply Scheme (Zone-I) TW no IV and external illumination works at Head Works Site(Zone-I&II) in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/008180) Assistant Engineer - II Junior Engineer-05 ORD/000238/2023-2024 2255/MLMD 18/07/2023 120 DAS CONSTRUCTION 19.75 5.11 25.87 0
18 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Continuation work order for the work of Hiring of 1 no diesel vehicle in good condition (traffic worthily) having licence contract carriage permit from Revisional Transport authority for office of the SE/NBC-II under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000590/2022-2023 1248/NBC-II 14/11/2022 180 TARUN KUMAR BHATTACHARYA 3.79 2.59 68.34 78
19 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Material Requisition To Resource Division RTOR000013/2022-2023 1872/MD 16/08/2022 Resource Division 88.26 0.00 0 0
20 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Material Requisition To Resource Division RTOR000108/2023-2024 38/MD 04/01/2024 Resource Division 1.85 0.00 0 0
21 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Material Requisition To Resource Division RTOR000180/2023-2024 778/MD 20/02/2024 Resource Division 1.23 0.00 0 0
22 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Acceptance cum formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of Augmentation of ARIDANGA ZONE-II Piped Water Supply Scheme at Ratua-II Block under Malda Division, PHE Dte. In the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000792/2022-2023 1476/MD 30/03/2023 30 UTTAM KUMAR GHOSH 11.04 10.61 96.11 75
23 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Construction of Pump House (5.40 mtr.X 3.60 mtr) at Head Work Site of Augmentation of Aridanga Zone-I Piped Water Supply Scheme at Ratua-II Block under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000139/2024-2025 2890/MD 07/06/2024 45 A.K. AGENCY 6.57 0.00 0 0
24 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Additional Laying Distribution of UPVC Pipeline of Augmentation of ARAIDANGA ZONE-I Piped Water Supply Scheme at Ratua-I Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000745/2023-2024 5248/MD 22/12/2023 45 M/S JHA CONSTRUCTION 31.99 13.90 43.45 80
25 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Formal work order for the work of Construction of 400 M³ Capacity OHR with FHTC of ARIDANGA ZON-II Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000014/2023-2024 1649/MD 13/04/2023 180 UTTAM KUMAR GHOSH 173.92 65.52 37.67 25
26 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Formal work order for the work of Construction of 900 M³ Capacity OHR with FHTC of Aridanga Zone-I Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the District of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000005/2023-2024 1572/MD 10/04/2023 365 USHA ENTERPRISE 338.37 150.19 44.39 20
27 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Village Uportola, Namotola, Radhanagar, Chunakhali and Paranpur under Aridanga Zone-II Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000880/2023-2024 155/MD 08/01/2024 45 GOALPARA CO-OPERATIVE LABOUR CONTRACT & CONSTRUCTION SOCIETY LIMITED. 12.15 8.94 73.58 70
28 MALDAH Malda Mechanical AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation JAL JEEVAN MISSION WEST BENGAL ESCROW AC. BILL/01571/2024-2025 null 15/07/2024 JAL JEEVAN MISSION WEST BENGAL ESCROW AC. 12.29 0.00 0 0
29 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of ARAIDANGA ZONE-I Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000747/2023-2024 5249/MD 22/12/2023 45 CHARU CONSTRUCTION 20.19 18.96 93.91 75
30 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of NIJGANPARANPUR under Araidanga Zone-II Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000723/2023-2024 4772/MD 05/12/2023 45 J. M. CONSTRUCTION 12.15 6.80 55.97 70
31 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Formal work order for the work of Laying of Distribution pipe line in connection with Augmentation of Araidanga (Zone-I) Pipe Water Supply Scheme at Ratua-II Block in the District of Malda under Malda Division P.H.E. Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000131/2022-2023 1784/MD 01/08/2022 60 USHA ENTERPRISE 282.55 280.52 99.28 1
32 MALDAH Malda Division AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME , SM/10181 Augmentation Additional Laying Distribution of UPVC Pipeline of Augmentation of ARAIDANGA ZONE-II Piped Water Supply Scheme at Ratua-II Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000746/2023-2024 5250/MD 22/12/2023 45 M/S KUNDU CONSTRUCTION 25.79 11.81 45.79 80
Total 1,427.14 751.87 52.68