Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 594.95 300.97 50.59  
1 DAKSHIN DINAJPUR Bansihari Balurghat Division SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Material Requisition To Resource Division RTOR000056/2022-2023 2880/BD 06/01/2023 Resource Division 27.64 0.00 0 0
2 DAKSHIN DINAJPUR Bansihari Central Drilling SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM X 245 MTRS DEPTH) BY UTILIZING DEPARTMENTAL MACHINERIES FOR SHYAMPUR W/S SCH UNDER DAKSHIN DINAJPUR DISTRICT, CDD, PHE DTE. Driller In Charge Junior Engineer ORD/000349/2022-2023 1608/CDD 15/12/2022 30 DEY ENTERPRISE 13.80 0.00 0 1
3 DAKSHIN DINAJPUR Bansihari Central Drilling SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM X 245 MTRS DEPTH) BY UTILIZING DEPARTMENTAL MACHINERIES FOR SHYAMPUR W/S SCH, UNDER DAKSHIN DINAJPUR DISTRICT, CDD, PHE DTE. Driller In Charge Junior Engineer ORD/000352/2022-2023 1607/CDD 15/12/2022 30 DEY ENTERPRISE 13.80 0.00 0 1
4 DAKSHIN DINAJPUR Bansihari Central Drilling SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM X 245 MTRS DEPTH) BY UTILISING DEPARTMENTAL MACHINERIES FOR SHYAMPUR W/S SCHEME (TW-II), BANSHIHARI BLOCK, UNDER DAKSHIN DINAJPUR DISTRICT, CDD, PHE DTE. ORD/000371/2022-2023 1608/ CDD 15/12/2022 30 DEY ENTERPRISE 13.80 10.75 77.9 0
5 DAKSHIN DINAJPUR Bansihari Central Drilling SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM X 245 MTRS DEPTH) BY UTILISING DEPARTMENTAL MACHINERIES FOR SHYAMPUR W/S SCHEME (TW-I), BANSHIHARI BLOCK, UNDER DAKSHIN DINAJPUR DISTRICT, CDD, PHE DTE. ORD/000372/2022-2023 1607/ CDD 15/12/2022 30 DEY ENTERPRISE 13.80 10.59 76.74 0
6 DAKSHIN DINAJPUR Bansihari Balurghat Division SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Material Requisition To Resource Division RTOR000028/2023-2024 835/BD 14/07/2023 Resource Division 14.37 0.00 0 0
7 DAKSHIN DINAJPUR Bansihari Malda Mechanical SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of SHYAMPUR, Buniadpur C.C.C in the district of Dakshin Dinajpur Under Malda Mechanical Division PHE Dte. Assistant Engineer - I ORD/000265/2023-2024 4003193516 17/07/2023 90 W.B.S.E.D.C.LTD 2.77 2.77 100 100
8 DAKSHIN DINAJPUR Bansihari Malda Mechanical SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New W.B.S.E.D.C.LTD Quotation charge at P/H No. II of SHYAMPUR, Buniadpur C.C.C in the district of Dakshin Dinajpur Under Malda Mechanical Division PHE Dte. Assistant Engineer - I ORD/000266/2023-2024 4003194835 18/07/2023 90 W.B.S.E.D.C.LTD 2.98 2.98 100 100
9 DAKSHIN DINAJPUR Bansihari Malda Mechanical SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I ,II and making compound lighting arrangement at T/W no. I of Shyampur Water Supply Scheme in the District of Dakshin Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/011902) Assistant Engineer - I Junior Engineer-01 ORD/000119/2023-2024 1125/MLMD 23/06/2023 120 DEVI ENTERPRISE... 26.57 19.19 72.22 72
10 DAKSHIN DINAJPUR Bansihari Balurghat Division SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Laying of Rising Main, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall & Approach Road for implementation of Shyampur Piped Water Supply Scheme at Banshihari Block in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte. Junior Engineer 1 Sub Division ORD/000020/2023-2024 270/BD 05/05/2023 270 DURJOY MITRA 204.86 25.67 12.53 35
11 DAKSHIN DINAJPUR Bansihari Malda Mechanical SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Supply, delivery and making lighting arrangement at T/W No-I of Shyampur W/S scheme in the District of Dakshin Dinajpur under Malda Mechanical Division P.H.E Dte. Junior Engineer-01 ORD/002626/2023-2024 1049/MLMD 15/03/2024 14 MAA BHABOTARINE ENTERPRISE 4.39 0.00 0 0
12 DAKSHIN DINAJPUR Bansihari Balurghat Division SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Laying of distribution pipeline by trenchless method using Horizontal Direct Drilling (HDD) machine at Different PWSS (Daulatpur PWSS, Shyampur PWSS, Patiram PWSS, Sundail PWSS, Brahmangaon PWSS, Gurkhair PWSS, Chakla PWSS) in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte. Assistant Engineer Sadar Junior Engineer (Civil),Junior Engineer 2 ORD/000170/2023-2024 1836/BD 10/11/2023 60 JMD ENGINEERING INFRASTRUCTURE COMPANY 21.30 0.00 0 100
13 DAKSHIN DINAJPUR Bansihari Balurghat Division SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Laying distribution pipe line for piped water supply scheme for Shyampur PWSS at Banshihari Block in the District of Dakshin Dinajpur under Balurghat Division, P.H. Engineering Dte. Assistant Engineer Sadar Junior Engineer 1 Sub Division ORD/000172/2022-2023 3267/BD 08/02/2023 90 MOHANTA BUILDERS 231.18 227.17 98.27 99
14 DAKSHIN DINAJPUR Bansihari Malda Mechanical SHYAMPUR PIPED WATER SUPPLY SCHEME , SM/11962 New Supply & Delivery of accesories of Pumping Machinery and installation of Voltage stabilizer and other Electro Mechanical components at T/W No-I & II of SHYAMPUR W/S scheme in the District of Dakshin Dinajpur under Malda Mechanical Division P.H.E Dte. Assistant Engineer - I Junior Engineer-01 ORD/002625/2023-2024 1048/MLMD 15/03/2024 14 MAA BHABOTARINE ENTERPRISE 3.69 1.85 50.14 100
Total 594.97 300.98 50.59