Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 379.12 170.84 45.06  
1 DAKSHIN DINAJPUR Harirampur Balurghat Division SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Material Requisition To Resource Division RTOR000051/2022-2023 2883/BD 06/01/2023 Resource Division 11.06 0.00 0 0
2 DAKSHIN DINAJPUR Harirampur Central Drilling SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM X 150 MTRS DEPTH) BY UTILIZING DEPARTMENTAL MACHINERIES FOR SUNDAIL W/S SCH TW-II, UNDER DAKSHIN DINAJPUR DISTRICT, CDD, PHE DTE. Driller In Charge Junior Engineer ORD/000359/2022-2023 1169/CDD 09/11/2022 30 M/S SAIKAT ENTERPRISE 8.28 6.25 75.48 0
3 DAKSHIN DINAJPUR Harirampur Central Drilling SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM X 150 MTRS DEPTH) BY UTILIZING DEPARTMENTAL MACHINERIES FOR SUNDAIL W/S SCH TW-I, UNDER DAKSHIN DINAJPUR DISTRICT, CDD, PHE DTE. Driller In Charge Junior Engineer ORD/000361/2022-2023 1168/CDD 09/11/2022 30 S B S ENTERPRISE 8.20 6.10 74.39 0
4 DAKSHIN DINAJPUR Harirampur Balurghat Division SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Material Requisition To Resource Division RTOR000023/2023-2024 836/BD 14/07/2023 Resource Division 7.34 0.00 0 0
5 DAKSHIN DINAJPUR Harirampur Malda Mechanical SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of SUNDAIL, Harirampur C.C.C in the district of Dakshin Dinajpur Under Malda Mechanical Division PHE Dte. Assistant Engineer - I ORD/000268/2023-2024 4003195607 19/07/2023 90 W.B.S.E.D.C.LTD 6.61 6.61 100 100
6 DAKSHIN DINAJPUR Harirampur Malda Mechanical SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New W.B.S.E.D.C.LTD Quotation charge at P/H No. II of SUNDAIL, Harirampur C.C.C in the district of Dakshin Dinajpur Under Malda Mechanical Division PHE Dte. Assistant Engineer - I ORD/000269/2023-2024 4003195612 19/07/2023 90 W.B.S.E.D.C.LTD 6.85 6.85 100 100
7 DAKSHIN DINAJPUR Harirampur Central Drilling SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Additional carraige of gravels for Construction of Tube well at SUNDAIL PWSS TW-II, Harirampur block, Dakshin Dinajpur District under CMSD-I (D), CDD PHE Dte. ORD/000478/2022-2023 586/CMSD-I(D) 30/11/2022 7 M/S SAIKAT ENTERPRISE 0.59 0.37 62.71 100
8 DAKSHIN DINAJPUR Harirampur Central Drilling SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Additional carraige of gravels for Construction of Tube well at SUNDAIL PWSS TW-I, Harirampur block, Dakshin Dinajpur District under CMSD-I (D), CDD PHE Dte. ORD/000480/2022-2023 585/CMSD-I(D) 30/11/2022 7 S B S ENTERPRISE 0.59 0.37 62.71 100
9 DAKSHIN DINAJPUR Harirampur Malda Mechanical SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I ,II and making compound lighting arrangement at T/W no. I of Sundail Water Supply Scheme in the District of Dakshin Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/011985) Assistant Engineer - I Junior Engineer-01 ORD/000178/2023-2024 2097/MLMD 04/07/2023 120 GHOSH BROTHERS... 26.29 9.60 36.52 73
10 DAKSHIN DINAJPUR Harirampur Balurghat Division SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Laying of distribution pipeline by trenchless method using Horizontal Direct Drilling (HDD) machine at Different PWSS (Daulatpur PWSS, Shyampur PWSS, Patiram PWSS, Sundail PWSS, Brahmangaon PWSS, Gurkhair PWSS, Chakla PWSS) in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte. Assistant Engineer Sadar Junior Engineer (Civil),Junior Engineer 2 ORD/000170/2023-2024 1836/BD 10/11/2023 60 JMD ENGINEERING INFRASTRUCTURE COMPANY 21.30 0.00 0 100
11 DAKSHIN DINAJPUR Harirampur Balurghat Division SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Laying of Rising Main, Providing FHTC, Construction of 200 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall & Approach Road for implementation of Sundail Piped Water Supply Scheme at Harirampur Block in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte. Assistant Engineer Sadar Junior Engineer 2 Sub Division ORD/000012/2023-2024 189/BD 28/04/2023 270 M/S. ANWESHA ENTERPRISE 163.05 31.47 19.3 36
12 DAKSHIN DINAJPUR Harirampur Balurghat Division SUNDAIL PWSS at Harirampur Block, under Balurghat Division, P.H.E. Dte. , SM/11929 New Laying distribution pipe line for piped water supply scheme at SUNDAIL under Ground Water Based Piped Water Supply Scheme at Harirampur Block in the District of Dakshin Dinajpur under Balurghat Division P.H.Engineering Dte. Assistant Engineer Sadar Junior Engineer 2 Sub Division ORD/000173/2022-2023 3159/BD 27/01/2023 60 BANIK BROTHERS 118.96 103.22 86.77 95
Total 379.12 170.85 45.06