Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 566.2 98.38 17.38  
1 UTTAR DINAJPUR Hemtabad Raiganj Division Kashimpur Piped Water Supply Scheme. , SM/18182 New Material Requisition To Resource Division RTOR000043/2023-2024 1333/RD/PHE 15/05/2023 0 Resource Division 36.10 0.00 0 0
2 UTTAR DINAJPUR Hemtabad Malda Mechanical Kashimpur Piped Water Supply Scheme. , SM/18182 New W.B.S.E.D.C.LTD Quotation charge at TW No- I of Kashimpur, Hemtabad CCC in the dist of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. BILL/00208/2024-2025 BP-2024-25-71 16/04/2024 0 W.B.S.E.D.C.LTD 3.37 0.00 0 0
3 UTTAR DINAJPUR Hemtabad Malda Mechanical Kashimpur Piped Water Supply Scheme. , SM/18182 New W.B.S.E.D.C.LTD Quotation charge at TW No- II of Kashimpur, Hemtabad CCC in the dist of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. BILL/00209/2024-2025 BP-2024-25-72 16/04/2024 0 W.B.S.E.D.C.LTD 7.00 0.00 0 0
4 UTTAR DINAJPUR Hemtabad Raiganj Division Kashimpur Piped Water Supply Scheme. , SM/18182 New Rig bored Tube-Well in connection with Implementation of New PWSS in different Pipe Water Supply Scheme(New) 1.Palaibari, 2.Kashimpur in the District Of Uttar Dinajpur under Raiganj Division, PHE Dte. Assistant Engineer RSD Junior Engineer, RSD ORD/000032/2023-2024 1491/RD/PHE 17/05/2023 675 M/S SARKAR ENTERPRISE SILIGURI SARKARETP2010@GMAIL.COM 57.19 0.00 0 80
5 UTTAR DINAJPUR Hemtabad Malda Mechanical Kashimpur Piped Water Supply Scheme. , SM/18182 New Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II of Kashimpur Water Supply Scheme in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/003990) Assistant Engineer - I Junior Engineer-07 ORD/000423/2023-2024 2446/MLMD 04/08/2023 516 DEB CONSTRUCTION. 22.84 5.76 25.22 100
6 UTTAR DINAJPUR Hemtabad Raiganj Division Kashimpur Piped Water Supply Scheme. , SM/18182 New Implementation of KASHIMPUR and it's adjoining mouzas Pipe Water Supply Scheme at HEMTABAD Block of Uttar Dinajpur District under Raiganj Division, PHE Dte. Assistant Engineer RSD Junior Engineer, RSD ORD/000005/2023-2024 1132/RD/PHE 24/04/2023 900 M/S J.S.B ASSOCIATE CONSTRUCTION NAMEDUTTA@GMAIL.COM 407.34 92.62 22.74 55
7 UTTAR DINAJPUR Hemtabad Raiganj Division Kashimpur Piped Water Supply Scheme. , SM/18182 New Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per design norms of CPHEEO(latest) with necessary accessories for Kashimpur Water Supply Scheme at Hemtabad Block under Raiganj Division, P.H.E. Dte. Dist: Uttar Dinajpur, Capacity- 80 M3/hr. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000306/2025-2026 2473/RD/PHE 12/09/2025 180 UNIVERSAL ENGINEERS CO-OPERATIVE SOCIETY LTD. 32.36 0.00 0 0
Total 566.19 98.38 17.38