Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 514.33 164.99 32.08  
1 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Preparation and submission of DPR for drinking Water Supply Scheme to facilitate uncovered mouzas under Uttar Dinajpur District, Block- Itahar. Assistant Engineer RSD ORD/000576/2022-2023 1770/RD/PHE 19/09/2022 15 RADIANT 47.87 4.23 8.84 100
2 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Material Requisition To Resource Division RTOR000062/2023-2024 2232/RD/PHE 01/08/2023 0 Resource Division 29.61 0.00 0 0
3 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Work Order for hiring charges of vehicle with fuel, hired for site works of Raiganj Division, P.H.E. Dte. for the period from 03.06.2024 to 07.06.2024. BILL/00130/2024-2025 BP-2024-25-92 28/06/2024 0 M/S DILWAR HOSAIN 0.10 0.00 0 0
4 UTTAR DINAJPUR Itahar Malda Mechanical Dhamdhol Piped Water Supply Scheme. , SM/14639 New Quotation for new service connection at DHAMDHOL PH-II (Itahar ccc) in the district of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. BILL/03791/2023-2024 BP-2024-25-16 04/04/2024 0 W.B.S.E.D.C.LTD 6.04 0.00 0 0
5 UTTAR DINAJPUR Itahar Malda Mechanical Dhamdhol Piped Water Supply Scheme. , SM/14639 New Quotation for new service connection at Dhamdhol PH-I (Itahar ccc) BILL/03519/2023-2024 BP-2023-24-539 15/02/2024 0 W.B.S.E.D.C.LTD 3.97 0.00 0 0
6 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Work Order for hiring charges of vehicle with fuel, hired for site works of Raiganj Division, P.H.E. Dte. for the period for 02.05.2024 to 03.05.2024, 06.05.2024 to 07.05.2024 and 09.05.2024 to 10.05.2024. BILL/00131/2024-2025 BP-2024-25-91 28/06/2024 0 M/S DILWAR HOSAIN 0.10 0.00 0 0
7 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New SUBMISSION OF DETAILED ESTIMATE & DEMAND FOR PLACING NECESSARY FUND UNDER DIFFERENT PWSS BILL/01217/2023-2024 BP-2024-25-25 24/04/2024 0 EXECUTIVE ENGINEER PWD ROADS 6.55 0.00 0 0
8 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Implementation of DHAMDOL and it's adjoining mouzas Pipe Water Supply Scheme at ITAHAR Block of Uttar Dinajpur District under RaiganjDivision, PHE Dte. Assistant Engineer HQ,Assistant Engineer RSD,Assistant Engineer RWS SD Junior Engineer RWS HQ,Junior Engineer, RSD ORD/000311/2022-2023 565/RD/PHE 23/02/2023 546 M/S LOKENATH CONSTRUCTION 300.71 142.34 47.33 40
9 UTTAR DINAJPUR Itahar Malda Mechanical Dhamdhol Piped Water Supply Scheme. , SM/14639 New Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no- I,II & Making compound yard lighting arrangement at T/W no- I of DHAMDHOL Water Supply Scheme in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte (TSM/016124) Assistant Engineer - I Junior Engineer-02 ORD/001834/2023-2024 3632/MLMD 23/11/2023 676 DILIP MAHATO. 25.51 18.02 70.64 83
10 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Construction Of Approach Road, Laying of Pipe Line And Other Allied Works Of Dhamdhol PWSS Within Itahar Block Under Raiganj Division P.H.E. Dte., Raiganj, Uttar Dinajpur. Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD Junior Engineer RWS HQ ORD/000391/2024-2025 3561/RD/PHE 05/12/2024 91 M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) 71.06 0.00 0 0
11 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Hiring of Additional well-maintained Diesel Maxi Cab (Non-A.C.) for the office of the Assistant Engineer, Raiganj Sub-Division, P.H.E. Dte. for the purpose of supervision of JJM works having jurisdiction over the entire Raiganj Sub-Division, P.H.E. Dte. under Raiganj Division, P.H.E. Dte. in the District of Uttar Dinajpur. For 12 months (Period from 17.10.2023 to 16.10.2024) Assistant Engineer RSD Junior Engineer, RSD ORD/000627/2023-2024 2876/RD/PHE 17/10/2023 366 ARNAB DUTTA 4.80 0.40 8.33 100
12 UTTAR DINAJPUR Itahar Raiganj Division Dhamdhol Piped Water Supply Scheme. , SM/14639 New Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per design norms of CPHEEO(latest) with necessary accessories for Dhamdol Water Supply Scheme at Itahar Block under Raiganj Division, P.H.E. Dte. Dist:- Uttar Dinajpur, Capacity- 35 M3/hr. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000311/2025-2026 2476/RD/PHE 12/09/2025 180 M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) 18.01 0.00 0 0
Total 514.32 164.99 32.08