Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 421.82 140.91 33.41  
1 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Preparation & Submission of DPR for proposed Barhans Piped Water Supply Scheme under Karandighi Development Block. Assistant Engineer RWS SD Junior Engineer, RWS ORD/000798/2021-2022 616/RD/PHE 16/03/2022 30 ENVIROTECH SOLUTIONS 3.11 0.00 0 0
2 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Preparation & Submission of DPR for Proposed Barhans Piped Water Supply Scheme under Karandighi block. Assistant Engineer RWS SD Junior Engineer, RWS ORD/000804/2021-2022 616/RD/PHED 16/03/2022 30 ENVIROTECH SOLUTIONS 3.11 3.11 100 0
3 UTTAR DINAJPUR Karandighi Malda Mechanical Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New W.B.S.E.D.C.LTD Quotation charge at T/W No. II of Barhans PWSS , Karandighi C.C.C in the district of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. Assistant Engineer - I Junior Engineer-02 ORD/001945/2023-2024 4003220342 07/09/2023 90 W.B.S.E.D.C.LTD 5.38 5.38 100 100
4 UTTAR DINAJPUR Karandighi Malda Mechanical Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New W.B.S.E.D.C.LTD Quotation charge at T/W No. I of Barhans PWSS , Karandighi C.C.C in the district of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. Assistant Engineer - I Junior Engineer-02 ORD/001946/2023-2024 4003220337 07/09/2023 90 W.B.S.E.D.C.LTD 14.71 14.71 100 100
5 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Material Requisition To Resource Division RTOR000085/2022-2023 586/RD/PHE 24/02/2023 0 Resource Division 15.91 0.00 0 0
6 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Material Requisition To Resource Division RTOR000093/2023-2024 2352/RD/PHE 11/08/2023 0 Resource Division 16.43 0.00 0 0
7 UTTAR DINAJPUR Karandighi Malda Mechanical Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II and making compound lighting arrangement at head worksite at T/W no. I of Barhans Water Supply Scheme in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/014865) Assistant Engineer - I Junior Engineer-02 ORD/000420/2023-2024 2471/MLMD 04/08/2023 815 NIRMAN. 24.86 17.90 72 72
8 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Hiring of well-maintained Diesel Maxi Cab (Non-A.C.) for the office of the Assistant Engineer, RWS Raiganj Sub-Division, P.H.E. Dte. for the purpose of office duty having jurisdiction over the entire RWS Raiganj Sub-Division, P.H.E. Dte. under Raiganj Division, P.H.E. Dte. in the District of Uttar Dinajpur. Period for 4(Four) Month (01/03/2024 to 30/06/2024). Assistant Engineer RWS SD Junior Engineer, RWS ORD/000626/2023-2024 472/RD/PHE 28/02/2024 121 PRITAM SARKAR 1.60 0.40 25 0
9 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Construction of Boundary Wall With Gate at Head Work Site & 2nd Tube-Well Site under BARHANS PWSS at Karandighi Block under Raiganj Division, PHE Dte. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RWS SD Junior Engineer, RSD ,Junior Engineer, RWS ORD/000501/2023-2024 603/RD/PHE 05/03/2024 360 M/S MAA BOLLA CONSTRUCTION 22.57 6.54 28.98 100
10 UTTAR DINAJPUR Karandighi Malda Mechanical Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Additional Quotation for HT AB cable at BARHANS PH-II (Karandighi ccc) in the district of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. (SM/12779). BILL/01110/2024-2025 BP-2024-25-279 05/06/2024 0 W.B.S.E.D.C.LTD 6.56 0.00 0 0
11 UTTAR DINAJPUR Karandighi Malda Mechanical Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Additional Quotation for new service connection at BARHANS PH-II (Karandighi ccc) in the district of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. (SM/12779) BILL/02080/2024-2025 BP-2024-25-486 09/09/2024 0 W.B.S.E.D.C.LTD 3.40 0.00 0 0
12 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Implementation of BARHANS and it's adjoining mouzas Pipe Water Supply Scheme at KARANDIGHI Block of Uttar Dinajpur District under Raiganj Division, PHE Dte Assistant Engineer HQ,Assistant Engineer RWS SD Junior Engineer, RSD ,Junior Engineer, RWS ORD/000221/2022-2023 99/RD/PHE 19/01/2023 1078 TAPAN KUMAR DUTTA ARNABD121@GMAIL.COM 271.31 92.87 34.23 62
13 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site & 2nd tubewell site and road restoration of Barhans PWSS at Karandighi Block under Raiganj Division, PHE Dte., Uttar Dinajpur. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD Junior Engineer, RSD ORD/000449/2024-2025 3761/RD/PHED 18/12/2024 30 TAPAN KUMAR DUTTA ARNABD121@GMAIL.COM 11.73 0.00 0 0
14 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Hiring of Additional well-maintained Diesel Maxi Cab (Non-A.C.Vehicle no. WB74AP 7552) for the office of the Assistant Engineer, Head Quarter, Raiganj Division, P.H.E. Dte. for the purpose of supervision of JJM works having jurisdiction over the entire Raiganj Division, P.H.E. Dte. in the District of Uttar Dinajpur. For 6(Six) Month( period from 27.11.2024 to 26.05.2025). Assistant Engineer HQ,Assistant Engineer RWS SD Junior Engineer, RSD ORD/000412/2024-2025 3446/RD/PHE 26/11/2024 181 M/S SARKAR ENTERPRISE SILIGURI 2.40 0.00 0 0
15 UTTAR DINAJPUR Karandighi Raiganj Division Barhans Piped Water Supply Scheme at Karandighi block in the district of Uttar Dinajpur. , SM/12779 New Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per design norms of CPHEEO(latest) with necessary accessories for Barhans Water Supply Scheme at Karandighi Block under Raiganj Division, P.H.E. Dte. Dist:- Uttar Dinajpur, Capacity- 40 M3/hr. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000339/2025-2026 2488/RD/PHE 12/09/2025 180 AJIT PRAMANIK 18.74 0.00 0 0
Total 421.83 140.92 33.41