Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 492.11 261.62 53.16  
1 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Material Requisition To Resource Division RTOR000082/2022-2023 2200/RD/PHE 14/12/2022 0 Resource Division 28.55 0.00 0 0
2 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Implementation of ADAIR and its adjoining mouzas Pipe Water Supply Scheme at Raiganj Block of Uttar Dinajpur District under Raiganj Division, PHE Dte(2nd Call). Assistant Engineer RSD Junior Engineer, RSD ORD/000325/2022-2023 621/RD/PHE 28/02/2023 455 M/S SOMNATH KUNDU 338.34 240.99 71.23 60
3 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Continuation Order Hiring of Additional well-maintained Diesel Maxi Cab (Non-A.C., Vehical No. WB60T 9215) for the office of the Assistant Engineer, Raiganj Sub-Division, P.H.E. Dte. for the purpose of supervision of JJM works having jurisdiction over the entire Raiganj Sub-Division, P.H.E. Dte. under Raiganj Division, P.H.E. Dte. in the District of Uttar Dinajpur. Period from 17.10.2024 to 14.01.2025) Assistant Engineer RSD ORD/000409/2024-2025 3045/RD/PHE 04/10/2024 90 ARNAB DUTTA 1.20 0.00 0 0
4 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site & 2nd tubewell site and road restoration of Adiar PWSS at Raiganj Block under Raiganj Division, PHE Dte., Uttar Dinajpur. Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000443/2024-2025 3755/RD/PHED 18/12/2024 45 M/S SOMNATH KUNDU 30.08 0.00 0 0
5 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Laying distribution of rising main and Balance Pipeline for Implementation of ADIAR and its adjoining mouzas Piped Water Supply Scheme at Raiganj Block of Uttar Dinajpur District under Raiganj Division, PHE Dte. (Phase-1) Assistant Engineer RSD,Assistant Engineer RWS SD Junior Engineer, RWS ORD/000063/2024-2025 2226/RD/PHE 23/07/2024 60 M/S SOMNATH KUNDU 32.67 0.00 0 63
6 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New DEMAND FOR PLACING NECESSARY FUND UNDER DIFFERENT PWSS BILL/01224/2023-2024 BP-2024-25-24 24/04/2024 0 EXECUTIVE ENGINEER PWD ROADS 5.18 0.00 0 0
7 UTTAR DINAJPUR Raiganj Malda Mechanical ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Additional Quotation for TW-II of Adiar Water Supply Scheme in the District of Uttar Dinajpur. BILL/02074/2024-2025 BP-2024-25-487 09/09/2024 0 W.B.S.E.D.C.LTD 0.74 0.00 0 0
8 UTTAR DINAJPUR Raiganj Malda Mechanical ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New W.B.S.E.D.C.LTD Quotation charge at TW No- I of Adiar, Raiganj CCC in the dist of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. BILL/03499/2023-2024 BP-2023-24-519 15/02/2024 0 W.B.S.E.D.C.LTD 2.53 0.00 0 0
9 UTTAR DINAJPUR Raiganj Malda Mechanical ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New W.B.S.E.D.C.LTD Quotation charge at TW No- II of Adiar, Raiganj CCC in the dist of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. BILL/03500/2023-2024 BP-2023-24-520 15/02/2024 0 W.B.S.E.D.C.LTD 6.12 0.00 0 0
10 UTTAR DINAJPUR Raiganj Malda Mechanical ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II and Making Compound Lighting arrangement and allied works at T/W No. I of Adiar Water Supply Scheme in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/012052) Assistant Engineer - I Junior Engineer-04,Junior Engineer-07 ORD/000398/2023-2024 2456/MLMD 04/08/2023 962 M/S D.G.B. ENTERPRISE. 26.47 20.63 77.94 90
11 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Trial Run For Adiar PWSS under Raiganj Block under Raiganj Division ,PHE Dte. for 3 months Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000698/2024-2025 539/RD/PHE 12/02/2025 90 M/S SOMNATH KUNDU 0.88 0.00 0 0
12 UTTAR DINAJPUR Raiganj Raiganj Division ADIAR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12108 New Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per design norms of CPHEEO(latest) with necessary accessories for Adiar Water Supply Scheme at Raiganj Block under Raiganj Division, P.H.E. Dte. Dist:- Uttar Dinajpur, Capacity- 45 M3/hr. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000290/2025-2026 1816/RD/PHE 24/06/2025 180 M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) 19.35 0.00 0 0
Total 492.10 261.61 53.16