Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 850.01 175.25 20.62  
1 UTTAR DINAJPUR Raiganj Raiganj Division RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Material Requisition To Resource Division RTOR000066/2022-2023 2183/RD/PHE 12/12/2022 0 Resource Division 48.49 0.00 0 0
2 UTTAR DINAJPUR Raiganj Raiganj Division RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Restoration in connection with laying of PHE pipeline of Barduary- Bindole road under the jurisdiction of Uttar Dinajpur Highway Division in the district Uttar Dinajpur. BILL/00504/2023-2024 BP-2023-24-129 29/09/2023 0 EXECUTIVE ENGINEER PWD ROADS 22.53 0.00 0 0
3 UTTAR DINAJPUR Raiganj Malda Mechanical RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II and Making Compound Lighting arrangement and allied works at T/W No. I of Rampur Water Supply Scheme in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/012698) Assistant Engineer - I Junior Engineer-07 ORD/000362/2023-2024 2371/MLMD 28/07/2023 822 WEST BENGAL ENGINEERING COMPANY. 24.97 0.00 0 42
4 UTTAR DINAJPUR Raiganj Malda Mechanical RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New W.B.S.E.D.C.LTD Quotation charge at TW No- II of Rampur Raiganj CCC in the dist of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. BILL/03534/2023-2024 BP-2023-24-554 15/02/2024 0 W.B.S.E.D.C.LTD 2.87 0.00 0 0
5 UTTAR DINAJPUR Raiganj Malda Mechanical RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New W.B.S.E.D.C.LTD Quotation charge at TW No- I of Rampur, Raiganj CCC in the dist of Uttar Dinajpur Under Malda Mechanical Division PHE Dte. BILL/03535/2023-2024 BP-2023-24-555 15/02/2024 0 W.B.S.E.D.C.LTD 6.87 0.00 0 0
6 UTTAR DINAJPUR Raiganj Malda Mechanical RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Additional Quotation of Rampur Water Supply Scheme Pump House-I in the Dist of Uttar Dinajpur. BILL/01068/2024-2025 BP-2024-25-308 05/06/2024 0 W.B.S.E.D.C.LTD 6.79 0.00 0 0
7 UTTAR DINAJPUR Raiganj Raiganj Division RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Implementation of RAMPUR and it's adjoining mouzas Pipe Water Supply Scheme at Raiganj Block of Uttar Dinajpur District under Raiganj Division. Assistant Engineer RSD Junior Engineer, RSD ORD/000245/2022-2023 294/RD/PHE 01/02/2023 1065 UTTAM SAHA 588.22 175.25 29.79 40
8 UTTAR DINAJPUR Raiganj Raiganj Division RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site & 2nd tubewell site and road restoration of Rampur PWSS at Raiganj Block under Raiganj Division, PHE Dte., Uttar Dinajpur. Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD Junior Engineer, RSD ORD/000444/2024-2025 3756/RD/PHED 18/12/2024 103 M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) 95.53 0.00 0 0
9 UTTAR DINAJPUR Raiganj Raiganj Division RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Balance distribution System of Laying Pipeline with Construction of Boundary Wall With Gate at Head Work Site & 2nd Tube-Well Site under RAMPUR Piped Water Supply Scheme at Raiganj Block under Raiganj Division, PHE Dte. in the District of Uttar Dinajpur. Assistant Engineer HQ,Assistant Engineer RSD,Assistant Engineer RWS SD Junior Engineer, RSD ,Junior Engineer, RWS ORD/000478/2023-2024 586/RD/PHE 05/03/2024 360 TAPAN KUMAR DUTTA ARNABD121@GMAIL.COM 22.82 0.00 0 90
10 UTTAR DINAJPUR Raiganj Raiganj Division RAMPUR Piped Water Supply Scheme at Raiganj block under uttar Dinajpur district , SM/12105 New Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per design norms of CPHEEO(latest) with necessary accessories for Rampur Water Supply Scheme at Raiganj Block under Raiganj Division, P.H.E. Dte. Dist:- Uttar Dinajpur, Block:- Raiganj,Capacity- 70 M3/hr. Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD,Assistant Engineer RWS SD ORD/000275/2025-2026 1796/RD/PHE 24/06/2025 180 M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) 30.92 0.00 0 0
Total 850.01 175.25 20.62