Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 376 8.22 2.19  
1 JALPAIGURI Rajganj Jalpaiguri Division KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New Material Requisition To Resource Division RTOR000186/2023-2024 2049/JD 09/01/2024 0 Resource Division 7.47 0.00 0 0
2 JALPAIGURI Rajganj Jalpaiguri Division KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New Material Requisition To Resource Division RTOR000005/2024-2025 53/JD 09/04/2024 0 Resource Division 13.20 0.00 0 0
3 JALPAIGURI Rajganj Northern Mechanical KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New New Service Connection Charge for KHOLA CHAND FAPRI, TW NO-I, POWER HOUSE CCC APPLICATION NO. 4003352414 Consumer ID : 403172861 BILL/00524/2024-2025 BP/24-25/123 16/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 8.99 0.00 0 0
4 JALPAIGURI Rajganj Northern Mechanical KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New New Service Connection Charge for KHOLA CHAND FAPRI, TW NO-II, Powe House CCC APPLICATION NO. 4003352425 Reference ID : 403172863 BILL/00435/2024-2025 BP/24-25/87 18/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 15.71 0.00 0 0
5 JALPAIGURI Rajganj Jalpaiguri Division KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New Construction of different components of Kholachand Fapri PWSS i.e. TW, Pump Houses, Water distribution Network, OHR, RISING MAIN, FHTC etc. under Jal Jeevan Mission at Block - Rajganj under Jalpaiguri Division, P.H.E.Dte. Assistant Engineer,HQ Junior Engineer ORD/000064/2023-2024 266/JD 10/05/2023 180 M/S SARKAR ENTERPRISE 262.01 0.00 0 35
6 JALPAIGURI Rajganj Northern Mechanical KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for KHOLACHAND FAPRI PWSS, TW no I and II in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000311/2023-2024 1276/NMD 02/08/2023 608 P.K.ENGINEERING 22.11 8.22 37.18 50
7 JALPAIGURI Rajganj Northern Mechanical KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New Solarisation of WBSEDCL Energised Electrical Installation at different piped water supply schemes in connection with Jal Jeevan Mission in the Jalpaiguri District (RAJGANJ Block) under Northern Mechanical Division, P.H.E. Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000627/2024-2025 9/NMD 06/01/2025 120 SILIGURI VYAPAR PRIVATE LIMITED 45.53 0.00 0 0
8 JALPAIGURI Rajganj Jalpaiguri Division KHOLACHAND FAPRI PIPED WATER SUPPLY SCHEME , SM/15263 New Sub-Soil Investigation of proposed 200 cum capacity Over Head Reservoir with 20 mtr. staging height, below the depth greater than 10 mtr. to 30 mtr. from G. L. at the Head Works site of Kholachand Fapri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. Assistant Engineer,HQ Junior Engineer ORD/000800/2024-2025 87-HQ/JD 11/03/2025 20 APEX ENGINEERING 0.98 0.00 0 0
Total 376.01 8.22 2.19