Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
34 484.77 139.09 28.69  
1 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REJ, GORALBARI VCH/000908/2021-2022 BP-2021-22-139 14/12/2021 BISWAJIT BHADURI 2.66 0.00 0 0
2 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REJ. GORALBARI PWSS VCH/000913/2021-2022 BP-2021-22-136 14/12/2021 RANJIT KARMAKAR 4.88 0.00 0 0
3 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REJ. GORALBARI PWSS VCH/000907/2021-2022 BP-2021-22-138 14/12/2021 BISWAJIT BHADURI 3.12 0.00 0 0
4 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Retrofitting works including FHTC at Shubhachandi, Futkibari Including FHTC for Garalbari Zone ¿ II . W/S/S under Jalpaiguri Division , P.H.E. Dte Junior Engineer ORD/000274/2021-2022 818/RWS 30/11/2021 15 BISWAJIT BHADURI 4.38 0.00 0 1
5 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation IEP GORALBARI VCH/001204/2021-2022 BP-2021-22-322 28/02/2022 DREAM CONSTRACTION 3.85 0.00 0 0
6 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation IEP GORAL BARI VCH/001205/2021-2022 BP-2021-22-323 28/02/2022 RAGHU DAS 3.87 0.00 0 0
7 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation IEP GORAL BARI VCH/001206/2021-2022 BP-2021-22-319 28/02/2022 BISWAJIT BHADURI 3.85 0.00 0 0
8 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Sapna under the command area of Garalbari Zone-I W/S Scheme under Jalpaiguri Division PHE Dte. (Part-E) Junior Engineer ORD/000541/2021-2022 545/JD 28/02/2022 21 RABINDRANATH DUTTA 15.82 0.00 0 1
9 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation LDS FHTC AUG BAIKUR PART V VCH/001317/2021-2022 BP-2021-22-438 26/03/2022 MINTU CHAKRABORTY 78.25 0.00 0 0
10 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REPAIRING & RENOVATION OHR GORALBARI ZONE -II VCH/001376/2021-2022 BP-2021-22-539 31/03/2022 BISWAJIT BHADURI 3.76 0.00 0 0
11 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REPAIRING H/W GORALBARI ZONE -II VCH/001375/2021-2022 BP-2021-22-538 31/03/2022 ASIT PAUL 4.35 0.00 0 0
12 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REPAIRING & MAINTENANCE GORALBARI WSS VCH/001378/2021-2022 BP-2021-22-537 31/03/2022 PRADIP SAHA 4.20 0.00 0 0
13 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation FHTC GORALBARI ZONE-I VCH/001387/2021-2022 BP-2021-22-548 31/03/2022 RABINDRANATH DUTTA 14.90 0.00 0 0
14 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation rep. and renovetion of garalbari zone-ii VCH/000045/2022-2023 BP-2021-22-17 26/04/2022 ASIT PAUL 4.35 0.00 0 0
15 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation FHTC GORALBARI PWSS VCH/000242/2022-2023 bp2022-23-52 08/06/2022 BISWAJIT BHADURI 14.47 0.00 0 0
16 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation FHTC BHANDANI VCH/000250/2022-2023 BP-2022-23-71 04/07/2022 DULAL CHOUDHURY 3.34 0.00 0 0
17 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REP OF PUMP HOUSE FOR GORALBARI PWSS VCH/000324/2022-2023 BP-2022-23-128 23/08/2022 BISWAJIT BHADURI 0.42 0.00 0 0
18 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation REP OF PUMP HOUSE FOR GORALBARI PWSS VCH/000318/2022-2023 BP-2022-23-127 25/08/2022 ASIT PAUL 0.48 0.00 0 0
19 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation RE OF PUMP HOUSE B-WAAL FOR GORALBARI PWSS VCH/000323/2022-2023 bp2022-23 25/08/2022 PRADIP SAHA 0.47 0.00 0 0
20 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Providing Functional Household Tap Connection (FHTC) including Retrofitting at Sarkar Para, along PWD Road, Pranabananda Para, Baruapara, Moulani, Konpakri, Berubari More, Dangapara, Dhapganj etc. within Garalbari Zone-III W/S Scheme under Jalpaiguri Sadar Block in connection with Jal Sapna under Jalpaiguri Division, PHE Dte. Junior Engineer ORD/000514/2021-2022 538/JD 25/02/2022 60 ASIM GUPTA 92.47 30.02 32.46 1
21 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Sinking of 3 No. 250 mm x 150 mm x 132 m deep Rig Bored tube well by Reverse Rotary method of drilling for Rejuvenation of Goralbari Piped Water Supply Scheme (I, II, III) under Jalpaiguri Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000061/2022-2023 1217/JD 26/05/2022 30 JAYANTA GHOSH 22.70 21.88 96.39 0
22 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Repair works of O.H.R. Pump Houses and Boundary walls .at Goralbari Zone-III Piped Water Supply Scheme Under Jalpaiguri Division PHE Dte. (2nd Call) Assistant Engineer Junior Engineer ORD/000154/2023-2024 814/RWS 14/07/2023 21 TAPASH MOHANTA 4.33 0.00 0 0
23 JALPAIGURI Northern Mechanical Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Infrastructure Cost for GARALBARI , T/W III,ZONE-II under NAYABASTI PANDAPARA CCC, [APPLICATION NO. 100000079173, Reference ID : 860270383] BILL/00506/2023-2024 BP/23-24/56 14/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.58 0.00 0 0
24 JALPAIGURI Northern Mechanical Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Infrastructure Cost for GARALBARI , T/W III,ZONE-III under NAYABASTI PANDAPARA CCC, [APPLICATION NO. 100000077688, Reference ID : 860269318] BILL/00510/2023-2024 BP/23-24/56 14/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 13.89 0.00 0 0
25 JALPAIGURI Northern Mechanical Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation New Service Connection Charge for GARALBARI , T/W III,ZONE-III under NAYABASTI PANDAPARA CCC, [APPLICATION NO. 4003132474, Reference ID : 403012261] BILL/00511/2023-2024 BP/23-24/56 14/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.68 0.00 0 0
26 JALPAIGURI Northern Mechanical Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation New Service Connection Charge for GARALBARI , T/W III,ZONE-II under NAYABASTI PANDAPARA CCC, [APPLICATION NO. 4003119639, Reference ID : 403023006] BILL/00507/2023-2024 BP/23-24/56 14/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.68 0.00 0 0
27 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Retrofitting at Barodhighi,CWC Road, Baroghoria, Koharapara and adjacent area within Garalbari Zone-II under Jalpaiguri Sadar Block in connection with Jaldhara/ Jal Sapna under Jalpaiguri Division PHE Dte. Assistant Engineer Junior Engineer ORD/000238/2022-2023 1890/JD 22/09/2022 30 MONOJ GHOSH 26.94 26.87 99.74 100
28 JALPAIGURI Northern Mechanical Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation New Service Connection Charge for GARALBARI, ZONE-I , T/W III, under MASKALAIBARI CCC, [APPLICATION NO. 4003154244, Reference ID : 403015424] BILL/00588/2023-2024 BP/23-24/73 11/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.73 0.00 0 0
29 JALPAIGURI Northern Mechanical Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Infrastructure Cost for GARALBARI, ZONE-I , T/W III, under MASKALAIBARI CCC, [APPLICATION NO. 100000078007, Reference ID : 860269067] BILL/00589/2023-2024 BP/23-24/73 11/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 23.18 0.00 0 0
30 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Providing Functional Household Tap Connection (FHTC) including Retrofitting at Pradhan Para, Choudhury Para, Haripukuri, Uttar & Dakshin Danga para, Jamuri bari and Camperhat within Garalbari Zone-II W/S Scheme under Jalpaiguri Sadar Block in connection with Jal Sapna under Jalpaiguri Division PHE Dte. Junior Engineer ORD/000515/2021-2022 539/JD 25/02/2022 30 BISWAJIT BHADURI 29.32 0.00 0 100
31 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Emergency restoration of pipline at Nawapara related damage of culvert by heavy shower including Sheru para line within Garalbari Zone-I Piped Water Supply Scheme under Jalpaiguri Division, PHE Dte. (2nd Call) Assistant Engineer Junior Engineer ORD/000149/2023-2024 813/RWS 14/07/2023 14 SAPTASWA SARKAR 4.45 0.00 0 100
32 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Rising Main Connections(3 Nos.) including other necessary arrangement for Rejuvenation of Goralbari Piped Water Supply Scheme( Zone-I, Zone-II & Zone-III) under Jalpaiguri Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000491/2022-2023 290/RWS 29/03/2023 21 BAJRANG ENTERPRISE 5.97 0.00 0 100
33 JALPAIGURI Jalpaiguri Division Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Supply, Installation, Commissioning (Trial run for 3 months) including testing of 3 Nos. 20.00 cum per hour capacity pressure type IEP with accessories including construction of Blower Rooms (3.60MX3.00M ) Size, concrete platform & drain ...etc for Rejuvenation of Garalbari water supply scheme (for Zone-I, Zone-II & Zone-III) under Jalpaiguri Division PHE Dte. Assistant Engineer Junior Engineer ORD/000438/2022-2023 678/JD 16/03/2023 45 D. S. ENTERPRISE 53.46 31.31 58.57 100
34 JALPAIGURI Northern Mechanical Rejuvenation of Goralbari Piped Water Supply Scheme , SM/09390 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for REJUVENATION OF GARALBARI PWSS, in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000878/2022-2023 342/NMD 29/03/2023 30 SUMON ELECTRICAL 31.97 29.01 90.74 100
Total 484.78 139.10 28.69