Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 22,604.9 20.86 0.09  
1 DARJEELING Phansidewa Siliguri W/S Division BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Barapathuram Piped water supply schemes at the uncovered mouzas under Phansidewa Block of Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000326/2022-2023 407/SSD 28/07/2022 20 ENVIROTECH SOLUTIONS 3.99 3.99 100 100
2 DARJEELING Phansidewa Siliguri W/S Division BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New CONTINUATION ORDER FOR HIRING OF 1 (ONE) NO. MAXI CAB WITH ENGINE CAPACITY LESS THAN OR EQUAL TO 2000 CC (WITH AIR CONDITION) FOR THE OFFICE OF THE CHIEF ENGINEER (CIVIL), NORTHERN ZONE, P.H.E. DTE., VIVEKANANDA BHAWAN (2ND FLOOR), HILL CART ROAD, SILIGURI FOR THE PERIOD FROM 01.03.2023 TO 31.07.2023 (FOR CHIEF ENGINEER (CIVIL), NORTHERN ZONE, P.H.E. DTE.) i.e. 5 (FIVE) MONTHS. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000341/2022-2023 2645/SWSD 01/03/2023 153 PINKI DAM 0.74 1.31 177.03 40
3 DARJEELING Phansidewa Siliguri W/S Division BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Material Requisition To Resource Division RTOR000085/2022-2023 2200/SWSD 04/01/2023 0 Resource Division 85.16 0.00 0 0
4 DARJEELING Phansidewa Siliguri W/S Division BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Supply and erection of scheme information board made of 50X50X6 mm. M.S. angle frame 6'00X4'00 size at a height over 1.5M. over ground including ties and bracing made of 32X32X6 mm. M.S. Angle and legs(50X50X6mm) are embedded at a depth of 600 mm. and to be fixed in Cement Concrete(1:2:4) footing size 250X250X600 mm. under ground.The board for display to be made on self-adhesive latex venyle print (UVray protected) 100 micron as per standard format given from department to be pasted over M.S. sheet ( size-6'X4') including carriage , loading ,unloading at different sites under the area of four nos. Blocks under Siliguri Mahakuma Parishad area. Total nos of board -84 nos. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000319/2023-2024 641/SWSD 11/03/2024 15 BUDDHADEV NAG 11.93 5.54 46.44 55
5 DARJEELING Phansidewa Siliguri W/S Division BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Material Requisition To Resource Division RTOR000039/2023-2024 59/SWSD 09/01/2024 0 Resource Division 22.92 0.00 0 0
6 DARJEELING Phansidewa Northern Mechanical BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Infrastructure Cost for BARA PATHURAM, T/W-I,ZONE-II under PHASIDAWA CCC [APPLICATION NO. 4003340843 ; Reference ID : 403163867] BILL/02063/2023-2024 BP/23-24/313 28/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.55 0.00 0 0
7 DARJEELING Phansidewa Northern Mechanical BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New New Service Connection Charge for BARA PATHURAM, T/W No. I, ZONE-I under PHANSIDAWA CCC, [APPLICATION NO. 4003321578, Reference ID : 403148659] BILL/01973/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.26 0.00 0 0
8 DARJEELING Phansidewa Northern Mechanical BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Infrastructure Cost for BARA PATHURAM, T/W-I,ZONE-I under PHASIDAWA CCC [APPLICATION NO. 4003340866 , Reference ID : 403163866] BILL/02062/2023-2024 BP/23-24/313 28/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.33 0.00 0 0
9 DARJEELING Phansidewa Northern Mechanical BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New New Service Connection Charge for BARA PATHURAM, T/W No. II, ZONE-I under PHANSIDAWA CCC, [APPLICATION NO. 4003321619, Reference ID : 403148640] BILL/01974/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.62 0.00 0 0
10 DARJEELING Phansidewa Central Drilling BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
11 DARJEELING Phansidewa Siliguri W/S Division BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Construction of 250 cu.m. (1 No.) & 150 Cum (2Nos) capacity R.C.C Elevated Reservoir , 20 Mtrs. Stagging Height at the head work site ( Zn-l,Zn-ll & Zn-lll) including distribution system (HDPE) with Rising Main , Rig bore 6 nos big dia T/W by ODEX-165method, Providing Functional Household Connection (FHTC) , Construction of 6 nos. Pump Houses, 3 Nos. Blower Rooms, Boundary walls, Installation of I.E. Plants (Capacity 30,50 & 30 cu.m./hr), Horizontal boring, Soil Testing and allied works at BARA PATHURAM Piped WS Scheme within Phansidewa block, under Siliguri Sub Division, P.H.E. Dte. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000105/2023-2024 1131/SWSD 07/08/2023 807 UNIBRO INFRASERV PRIVATE LIMITED 1,076.34 0.00 0 30
12 DARJEELING Phansidewa Northern Mechanical BARA PATHURAM PIPED WATER SUPPLY SCHEME ( ZONE-I , II & III ) , SM/18321 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for BARA PATHURAM PIPED WATER SUPPLY SCHEME, ( ZONE-I) TW No. I, II, (ZONE-II) TW No. I, II and (ZONE-III) TW No. I, II, in the district of Darjeeling under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000791/2023-2024 1655/NMD 29/09/2023 712 ALPHA ENTERPRISE 45.30 10.02 22.12 24
Total 22,604.89 20.86 0.09