Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 22,089.66 296.7 1.34  
1 DARJEELING Naxalbari Siliguri W/S Division KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Kilaram Piped water supply schemes at the uncovered mouzas under Naxalbari Block of Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000318/2022-2023 251/SSD 12/05/2022 20 ENVIROTECH SOLUTIONS 3.36 3.36 100 0
2 DARJEELING Naxalbari Siliguri W/S Division KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New Material Requisition To Resource Division RTOR000005/2023-2024 205/SWSD 25/04/2023 0 Resource Division 67.51 0.00 0 0
3 DARJEELING Naxalbari Siliguri W/S Division KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New Material Requisition To Resource Division RTOR000031/2023-2024 2290/SWSD 11/12/2023 0 Resource Division 2.90 0.00 0 0
4 DARJEELING Naxalbari Siliguri W/S Division KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New Construction of 250 cu.m. Capacity R.C.C. Elevated Reservosir, 20 mtrs. Staging height at head works site, laying Rising Main, Laying distribution pipe line with Functional House Hold Tap Connection (FHTC), construction of three numbers Pump House (5.40 m X 3.60 m), 2 (two) nos. Iron Elimination Plant (IEP) with Blower Room Sinking of 3 (three) nos. Tube Well (ODEX-165 method) and Boundary Wall for KILARAM PWSS (Zone-I & II), Block Naxalbari, Dist. Darjeeling under Siliguri W/S Division, P.H.E. Dte Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000112/2023-2024 1159/SWSD 09/08/2023 240 RAMESH KUMAR AGARWAL & CO 645.57 293.34 45.44 55
5 DARJEELING Naxalbari Siliguri W/S Division KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New Material Requisition To Resource Division RTOR000049/2023-2024 74/SWSD 10/01/2024 0 Resource Division 13.27 0.00 0 0
6 DARJEELING Naxalbari Northern Mechanical KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New New Service Connection Charge for KILARAM, T/W No. I, under NAXALBARI CCC, [APPLICATION NO. 4003313640, Reference ID : 403145711] BILL/01972/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.56 0.00 0 0
7 DARJEELING Naxalbari Northern Mechanical KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New New Service Connection Charge for KILARAM, T/W No. II, under NAXALBARI CCC, [APPLICATION NO. 4003313623, Reference ID : 403145716] BILL/01970/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.53 0.00 0 0
8 DARJEELING Naxalbari Northern Mechanical KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New New Service Connection Charge for KILARAM, T/W No. III, under NAXALBARI CCC, [APPLICATION NO. 4003313552, Reference ID : 403145729] BILL/01971/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 8.20 0.00 0 0
9 DARJEELING Naxalbari Central Drilling KILARAM PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/16753 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 22,089.68 296.70 1.34