Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 21,723.3 8.95 0.04  
1 DARJEELING Phansidewa Siliguri W/S Division JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Jogibhita Piped water supply schemes at the uncovered mouzas under Phansidewa Block of Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000329/2022-2023 411/SSD 28/07/2022 20 ENVIROTECH SOLUTIONS 2.76 2.70 97.83 0
2 DARJEELING Phansidewa Siliguri W/S Division JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Material Requisition To Resource Division RTOR000010/2023-2024 209/SWSD 25/04/2023 0 Resource Division 23.71 0.00 0 0
3 DARJEELING Phansidewa Central Drilling JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Construction of Big diameter Tube-Well by Deployment of Suitable capacity Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different District for Different Water Supply Schemes Including Procurement & Installation Pumping machinery with All Allied accessories at the Above Constructed Tube - Wells under JJM Program throughout the State of West Bengal. (2nd call of NIET 25 of 2022-23). Assistant Engineer,Driller In Charge Junior Engineer ORD/000217/2023-2024 2292/CDD 19/03/2024 153 JHARGRAM SPV PRIVATE LIMITED 67.69 6.25 9.23 10
4 DARJEELING Phansidewa Siliguri W/S Division JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Material Requisition To Resource Division RTOR000056/2023-2024 81/SWSD 10/01/2024 0 Resource Division 6.67 0.00 0 0
5 DARJEELING Phansidewa Northern Mechanical JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Infrastructure Cost for JOGIBHITA T/W No. I, under BIDHANNAGAR CCC , [APPLICATION NO. 4003323751, Reference ID : 403152325] BILL/02034/2023-2024 BP/23-24/311 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.32 0.00 0 0
6 DARJEELING Phansidewa Northern Mechanical JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Infrastructure Cost for JOGIBHITA T/W No. II, under BIDHANNAGAR CCC , [APPLICATION NO. 4003323752, Reference ID : 403152314] BILL/02035/2023-2024 BP/23-24/311 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.10 0.00 0 0
7 DARJEELING Phansidewa Central Drilling JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
8 DARJEELING Phansidewa Siliguri W/S Division JOGIBHITA PIPED WATER SUPPLY SCHEME , SM/15928 New Part Work order for 150 cu.m capacity R.C.C. elevated reservoir, 20 mtrs staging height at the head works site along with distribution system, functional household tap connection, rising main, pump house (2 nos), IEP, boundary wall and tubewell under Jal Jeevan Mission for Jogibhita Piped Water Supply Scheme under Phansidewa block under Siliguri Sub Division, P.H.E. Dte. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000226/2023-2024 1979/SWSD 26/10/2023 737 M/S UTPAL CHAKRABORTY & CO. 271.29 0.00 0 25
Total 21,723.32 8.95 0.04