Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 21,729.41 1.2 0.01  
1 DARJEELING Naxalbari Siliguri W/S Division DHEMAL PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/15927 New Material Requisition To Resource Division RTOR000088/2022-2023 2212/SWSD 05/01/2023 Resource Division 11.92 0.00 0 0
2 DARJEELING Naxalbari Siliguri W/S Division DHEMAL PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/15927 New Construction of Pump House with toilet , laying distribution system, Rising Main, boring of deep tube well by ODEX-165 method, construction of Blower Room with IEP, Boundary Wall at H/W and second tube well site with necessary interconnection and providng FHTC and other allied work under Jal Jeevan Mission for DHEMAL Piped Water Supply Scheme Block : Naxalbari under Siliguri W/S Division, P.H.E. Dte. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000120/2023-2024 1225/SWSD 14/08/2023 150 K.R.ENTERPRISE 349.22 0.00 0 0
3 DARJEELING Naxalbari Siliguri W/S Division DHEMAL PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/15927 New Material Requisition To Resource Division RTOR000020/2023-2024 1804/SWSD 30/09/2023 Resource Division 11.72 0.00 0 0
4 DARJEELING Naxalbari Siliguri W/S Division DHEMAL PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/15927 New Material Requisition To Resource Division RTOR000029/2023-2024 2287/SWSD 11/12/2023 Resource Division 4.40 0.00 0 0
5 DARJEELING Naxalbari Siliguri W/S Division DHEMAL PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/15927 New Material Requisition To Resource Division RTOR000048/2023-2024 73/SWSD 10/01/2024 Resource Division 9.99 0.00 0 0
6 DARJEELING Naxalbari Siliguri W/S Division DHEMAL PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/15927 New Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Dhemal Piped water supply schemes at the uncovered mouzas under Naxalbari Block of Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000323/2022-2023 319/SSD 20/06/2022 20 ENVIROTECH SOLUTIONS 2.40 1.20 50 30
7 DARJEELING Naxalbari Central Drilling DHEMAL PIPED WATER SUPPLY SCHEME ( ZONE-I & II ) , SM/15927 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 21,729.42 1.20 0.01