Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 22,182.04 360.98 1.63  
1 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Continuation of Hiring of 1 (one) no. diesel consumed vehicle on monthly basis preferably Maxi Cab (with A/C) for O/O the Assistant Engineer, Siliguri Sub Division, P.H.E. Dte. from 01.09.2022 to 30.11.2022 (With Engine Capacity less than or equal to 2000 CC) (Vehicle no. WB 76A4921) Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000270/2022-2023 439/SSD 31/08/2022 91 SUDIP BASAK 0.44 0.97 220.45 100
2 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation PREPARATION OF DETAILS PROJECT REPORT (DPR) INCLUDING ROUTE SURVEY IN CONNECTION WITH AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME UNDER KHARIBARI BLOCK, SILIGURI SUB DIVISION, P.H.E. DTE Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000052/2023-2024 245/SSD 05/06/2023 10 ENVIROTECH SOLUTIONS 3.87 3.86 99.74 100
3 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Material Requisition To Resource Division RTOR000082/2022-2023 2199/SWSD 04/01/2023 0 Resource Division 31.91 0.00 0 0
4 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Material Requisition To Resource Division RTOR000015/2023-2024 1799/SWSD 30/09/2023 0 Resource Division 33.55 0.00 0 0
5 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and writing the surface with best quality synthetic enamel paint of approved shed and writing IEC message along with logo, picture etc of multiple colour sample as will be supplied by PHE Dte. by engaging skilled artist and helper artist in different location within 328 Villages in Different Block( Matigara,Phansidewa, KharibarI,Naxalbari Block) under Siliguri W/S Division all complete as per direction of EIC.In Each Villge in 4 Locations tentatively, In Each Location (8 X 5= 40 Sq.Ft) Writing Area Required or as per the Dimension given by PHE Dte.), Writing area should be Geo Tagged in appropriate portal as guided by PHE Department Assistant Engineer(Civil) Junior Engineer (Civil),Junior Engineer(Civil) ORD/000288/2023-2024 382/SWSD 15/02/2024 30 PHANSIDEWA SOCIAL & RURAL WELFARE SOCIETY 21.57 5.00 23.18 50
6 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation ISSUE OF FULE FOR OFFICE VEHICLES OF EXECUTIVE ENGINEER SILIGURI W/S DIVISION AND ASSISTANT ENGINEER PHE DTE BILL/00354/2023-2024 BP-2023-24-147 09/01/2024 0 SONA PETROL PUMP 0.53 0.00 0 0
7 DARJEELING Northern Mechanical AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation New Service Connection Charge for BARSADBHITA, T/W No. I, ZONE-II, under KHARIBARI CCC, [APPLICATION NO. 4003319471, Reference ID : 403145974] BILL/01969/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 9.56 0.00 0 0
8 DARJEELING Northern Mechanical AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation New Service Connection Charge for BARSADBHITA Zone-III,TW- I under KHARIBARI CCC BILL/00382/2024-2025 BP/24-25/73 30/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.50 0.00 0 0
9 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Hiring of (one) no. Disel Motor Cab on daily basis for the Assistant Engineer-II, office of the Executive Engineer, Siliguri W/S Division, P.H.E Dte. BILL/00353/2023-2024 BP-2023-24-154 09/01/2024 0 SUDIP BASAK 0.99 0.00 0 0
10 DARJEELING Northern Mechanical AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation New Service Connection Charge for BARSADBHITA, T/W No. II, ZONE- II, under KHARIBARI CCC, [APPLICATION NO. 4003319623, Reference ID : 403147073] BILL/01968/2023-2024 BP/23-24/306 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.54 0.00 0 0
11 DARJEELING Central Drilling AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 5.40 0.03 11
12 DARJEELING Siliguri W/S Division AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Construction of 200 cu.m. capacity R.C.C. Elevated Reservoir, 20 mtrs. Staging Height at the head works site (Zn-II) including distribution system all zones (HDPE) with Rising Main, Rig bore 3 nos. big dia T/W by Odex-165 method (Zn-II, III), Providing Functional Household Connection (FHTC), Pump House 3 Nos., Blower Room, IEP (Zone-III-30, Zn-II 30) cu.m/hr, Boundary Walls, Soil Testing & all repair works at Zone-I & Zn-II and allied works for Augmentation of BARSADVITA PWSS Kharibari block under Siliguri Sub Division, P.H.E. Dte. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000113/2023-2024 1192/SWSD 10/08/2023 753 RAMESH AGARWAL 572.07 345.75 60.44 60
13 DARJEELING Northern Mechanical AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Yard lighting arrangement at Head Work Site for Different PWSS under JJM in the BLOCK: KHARIBARI, DISTRICT: DARJEELING under Northern Mechanical Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001070/2024-2025 38/NMD 06/01/2025 30 DEY ENTERPRISE(MALDA) 15.33 0.00 0 0
14 DARJEELING Northern Mechanical AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Solarisation of WBSEDCL Energised Electrical Installation at different piped water supply schemes in connection with Jal Jeevan Mission in the Darjeeling District (KHARIBARI Block) under Northern Mechanical Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000997/2024-2025 16/NMD 06/01/2025 120 SILIGURI VYAPAR PRIVATE LIMITED 41.15 0.00 0 0
15 DARJEELING Northern Mechanical AUGMENTATION OF BARSADBHITA PIPED WATER SUPPLY SCHEME , SM/15924 Augmentation Implementation of Affordable IoT-Enabled Water Service Delivery Measurement and Monitoring Sensing System for Rural Deployment in the Proposed Villages under Different Water Supply Schemes at Different Block of Darjeeling District in West Bengal. Assistant Engineer Junior Engineer ORD/000092/2025-2026 1114/NMD 19/05/2025 180 WEBEL TECHNOLOGY LIMITED 96.27 0.00 0 0
Total 22,182.04 360.98 1.63